Central City II to proceed to Public Hearing

5iodhvn

After being referred back to Staff by Council on September 16 due to a misunderstanding over building height, Central City II returned to Council tonight to receive 1st & 2nd Readings and the OK to proceed to Public Hearing in 2 weeks. No changes were made to the proposal, which will proceed based on its original 25-storey (382′) height. The re-introduced planning report included better contextual information to help convey to the Mayor and Council how the building will fit into the surrounding area, as well as the sheer volume of office space it will contain given its large floor plate. The Mayor and Council had previously sent the application back to staff, having thought the tower would be shorter than the 35-Storey residential towers across the street at King George. McCallum’s arguments included:

  • “This is not a highrise development”
  • “Twenty-five storeys in our City Centre is way too low.”
  • “The towers at King George Station across the street are taller”
  • “We have only a certain amount of land in our City Centre and it’s really important to make sure we use that land appropriately”

In reality, the 25-Storey office tower would be slightly taller than the 35-storey residential tower across the street due to differences between residential and office floor heights. Central City 2 is proposed at 382 ft. while the Infinity tower at Concord Park Place is 377 ft. Further, if Central City II were built today, it would be the 3rd tallest building in Surrey after 3 Civic Plaza (538 ft.) and Park Avenue West (393 ft.). This would not be the case for long however, with 3 other towers currently under construction exceeding the height of Central City 2. Once those are completed, Central City 2 would be the 6th tallest in Surrey, yet still at comparable height to others in the top 5.

  • 3 Civic Plaza (538 ft.)
  • One Central (438 ft.)
  • Park Boulevard (407 ft.)
  • King George Hub B1 (404 ft.).
  • Park Avenue West (393 ft.)
  • Central City II (382 ft.)
yw7ztox
Comparison of Surrey’s tallest towers (built & under construction) with Central City II

Height aside, the sheer volume of office space to be provided by the building will bring a significant boost to the City Centre, where demand is currently high, and vacancy low. Central City 2 is to contain 567,114sq.ft. of class AAA commercial office space, when currently there is a total of just 1.2 million in the entire City Centre. That’s adding half the current amount of office space in City Centre in a single building. In addition, the building is to contain 16,168 sq.ft. of ground floor retail and restaurant space in its large podium spanning an entire city block. A market analysis commissioned by the developer found the amount of proposed space to be adequate in meeting current demand in City Centre.

ndnffg3
Central City 2 (far right) along with conceptual future redevelopment of mall site
askvvxs
Model of Central City 2 along with conceptual future redevelopment of mall site

More information on the proposal can be found in the planning report below:

https://www.surrey.ca/bylawsandcouncillibrary/PLR_7918-0428-00(1).pdf

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s