Development Application submitted for Central City 2

rZ2rHCK

Blackwood Partners has submitted a development application for the much anticipated Central City 2 office tower – proposed for the corner of King George Blvd and Old Yale Road on the site of a former Best Buy. The 25-storey tower designed by ZGF Architects is to be built to Class AAA and LEED Platinum standards and contain over 500,000 SF of office space, and 20,000 SF of ground level retail.

The proposed design of the tower has undergone considerable revision since first announced back in November 2017. The tower now features copper / reddish toned shading fins on its exterior, and a refined, more cohesive massing and podium. The tower also features expansive green roof decks, premium fitness facilities for office tenants, bike lockers, electric vehicle charging, high-speed elevators, and a ground level urban plaza, anchored by a restaurant, café, and retail.

VXh2s8o
New plaza at corner of Old Yale Road & City Parkway
zqwo83q
Conceptual ground level floor plan
rDaqBDB
Office tower views
pfGxQle
Premium fitness facilities for office tower tenants

Following the completion of the original Central City office tower and SFU campus back in 2003, Central City 2 will form the next phase of a long-term vision to redevelop the remainder of the Central City Shopping Centre site. While just conceptual at this point, the long-term plan would see the remaining parking lots to the north redeveloped with mixed-use development and new streets. The mall itself is envisioned to be reconfigured to include a number of new tower sites, and a large new plaza entrance fronting Holland Park on Old Yale Road – mirroring the existing Central City Plaza to the north and creating a connection through the mall linking the city’s civic core to Holland Park.

Don4fNR

bHoBJnC

Along with the recently submitted development application, Blackwood Partners has also now begun marketing the tower for lease, and will be opening a presentation centre in the Central City Shopping Centre in early 2019. The current leasing brochure can be found here.

New details released for ‘Central City 2’ office tower

r11hryw

Blackwood Partners, have released new details on their upcoming ‘Central City 2’ office tower project at the corner of Old Yale Rd and King George Blvd. A new leasing brochure, available on the Central City website, provides some updated renderings, floorplans, and marketing information aimed at future tenants looking for office and retail space.

Since first being announced back in November 2017, the new renderings depict a re-designed, more refined tower, from that initially conceptualized. The new design features a stronger podium fronting Old Yale Rd and a more cohesive tower floor-plate and massing compared to the previous design. The rectangular floor plate blends into an elliptical floor plate on higher floors – referencing the existing 25-storey Central City office tower at 102 Ave & University Dr built in 2003.

ji1gj4e
Conceptual rendering of tower podium and restaurant at corner of City Parkway and Old Yale Rd

Tower Details

Designed by Vancouver’s ZGF Architects, the project will be a 25-storey, Class AAA, mixed- use tower, containing 512,305 SF of commercial space and +/-20,000 SF of retail space contained within the podium. The ground level is conceptualized to contain 6 retail units, a restaurant, cafe, and office tower lobby, anchored to a prominent public plaza at the corner of Old Yale Rd and King George Blvd across from Holland Park and King George Station. The building will be built to LEED GoldDesign (with a pathway to Platinum), and also contain:

  • Premium end-of-trip facilities, with ample bicycle storage, executive bicycle lockers, shower, and change facilities
  • Approximately 900 underground parking stalls
  • High-speed state-of-the-art elevators
  • Electric vehicle charging stations and car share parking spaces.
  • Numerous other advanced technology features
raxorhs
Conceptualized ground-level floor plan
zp5lq7m
Artistic rendering of views from higher-level office floors
z5ucpkk
Artistic rendering of roof-top views overlooking Holland Park
i2vhyza
Artistic rendering of fitness facilities for office employees

Long-term plan

Also released as part of the leasing brochure is a glimpse at the long-range plan for redevelopment of the entire Central City site following Central City 2. This plan will see much of the existing indoor shopping centre retained but renovated, with the introduction of a new prominent plaza at its south-end along Old Yale Rd, linking the shopping centre directly onto Holland Park. The existing parking lot along King George Blvd is envisioned to be broken up into a series of new city blocks, containing mixed-use high-rise development sites. A re-aligned City Parkway will connect directly through the site from the north, past a new entry plaza where Wal-Mart currently exists.

s0ihdp7

While no target dates have been given for completion of Central City 2 – it is expected that a development application will be submitted for the project in the near future. The long-range plan for Central City is expected to play out over the next decade or longer. For more on Central City 2:

http://www.centralcity.ca/wp-content/uploads/2018/04/Tower-2-at-Central-City-Brochure-April-2018.pdf