Brightside by Bosa BlueSky heads to Public Hearing – UrbanSurrey

View looking west along 104 Avenue from King George Blvd

Surrey Council gave 1st & 2nd Readings on Monday night to Bosa BlueSky’s next project in Surrey City Centre – Brightside – which will now head to Public Hearing and 3rd Reading (Preliminary Approval) in 2 weeks. The project, which has been under application for the past 2 years, is set to transform the former Brick / Sears Outlet store site at City Parkway & 104 Avenue, which has been sitting vacant for numerous years now. Overall, the application is seeking:

  • A General Development Permit (Form & Character) for the entire site to allow for a phased, mixed-used development consisting of 3 high-rise and 2 low-rise buildings, including:
    • 40-Storey residential tower with ground floor retail (Phase 1)
    • 50-Storey mixed-use residential tower with ground floor retail and 17 floors of office in a stepped podium (Future Phase)
    • 50-Storey residential tower with market and rental units (Future Phase)
    • 2.5-Storey market-hall commercial building
    • 2-Storey amenity building
  • A Detailed Development Permit for phase 1 of the project.
  • OCP Amendment and City Centre Plan amendments to allow for up to 7.5 FAR (9.2 FAR net) density.
  • Rezoning
  • Consolidation from 2 existing lots to 2 new lots.

View looking north along City Parkway from Surrey Central Station View from public and amenity space within interior of site looking south View looking east along 104 Avenue Future ‘Market-hall’ commercial building in centre of site as part of future phases.

Designed by Perkins & Will, the first phase of the project, a 40-Storey residential tower with ground-floor retail, is to be located at the corner of City Parkway and 104 Avenue and will include:

  • 418 Market Residential Units
  • 2,831 sq.ft. of ground floor Retail

The remaining buildings, subject to future Detailed Development Permit applications, will be located further east along 104 Avenue and north along 105 Avenue. The tallest of the towers, the 50-Storey mixed-use building with 17-Storey office podium, would become the new tallest in Surrey once complete, assuming no other building surpasses it by then, at 554 ft. (169m). The two future low-rise amenity, and market-hall buildings located in the centre of the site are to be set within a publicly accessible plaza that will invite people into the site from 104 Avenue. The plaza will be activated by retail and restaurant spaces at grade, as well as landscaping, and public art, subject to future detailed design.

In total once all phases are complete, the project will include:

  • 1,352 Residential Units (including 200 rental units)
  • 202,146 sq.ft. of Office
  • 37,049 sq.ft. of Retail

In addition to the buildings on site, the project will also bring into alignment the intersection of City Parkway and 104 Avenue. The north and south portions of City Parkway on either side of 104 Avenue currently do not connect. This alignment is expected to be completed as part of the first phase, with tower 1 to be aligned on an angle with the newly constructed City Parkway.

Phase 1 of the project is expected to be completed by 2025, with the remaining buildings to follow later in the decade. For more on the project:

https://www.surrey.ca/bylawsandcouncillibrary/PLR_7918-0350-00.pdf

King George District – UrbanSurrey

A proposal to revitalize an existing rental tower and create 63 new rental units at King George Blvd & 98th Avenue was stalled by Surrey’s new Council on Monday, after being denied 1st & 2nd readings for not looking satisfactory enough, in Council’s opinion. The application, which is proposing to convert an existing 3-storey commercial building on site to rental residential, and upgrade the exterior of the 18-storey tower behind it, was sent back to staff to work with the applicant on unspecified revisions.

Designed in partnership with MCM Architects and PWL Landscape Architects, the project would bring a welcome facelift to the existing buildings on site, originally completed in 1982, as well as improve the surrounding streetscape. Aside from aesthetic upgrades, the primary objective of the project is to create 63 new rental units on site through the conversion of the existing 3-storey commercial building along King George Blvd. Details of the proposed upgrades include:

  • Modernization and conversion of the existing low-rise commercial building to rental residential. Exterior cladding to be replaced with new materials consisting of high quality white fibre cement panels, and charcoal seam metal cladding.
  • Landscaping along King George Blvd enhanced and modified to suit residential use and layout
  • New plaza at the north-east corner of the site to help activate the streetscape along King George Blvd
  • The existing 18-storey tower to receive new exterior paint and glass balcony rail replacements with colour enhancements.

Proposed exterior upgrades and residential conversion along King George Blvd Elevation of proposal looking north along King George Blvd

Despite the high quality materials proposed, and thoughtfully designed plan which works within the given site constraints, Council was of the opinion that the design was not suitable enough to be allowed to proceed. Without giving any specific recommendations on how to improve the design, the project was sent back to staff to work with the applicant on revisions to the plan, despite staff already working closely with the design team to date. The building’s modernization, and the delivery of new rental units to City Centre is now delayed pending unclear revisions, until the project can return to Council for consideration once again.

The conversion is supported by Surrey Staff as the existing commercial building has long suffered from poor vacancy rates and high tenant turn-over due to physical attributes of the building, and its poor integration with the neighbourhood. The proposed residential use is seen as appropriate for this location, being across from a SkyTrain station and the developing context of the area.

Proposed site plan including public realm and streetscape enhancements

The Surrey Village Tower currently contains 227 rental units in the existing 18-storey tower, managed by RealStar. The addition of the proposed 63 new units would bring the total rental units to 290.

PCI Developments is moving ahead with the next phase of its master-planned King George Hub development at King George Station. Following the success of ‘Phase B’ which is currently under construction, ‘Phase C’ will add a 34-storey rental apartment tower with ground floor retail to the site just east of the completed Coast Capital Savings headquarters (Phase A).

Originally planned to be an office tower site, ‘Phase C’ is to include 371 residential units, above 9,322 SF of ground floor retail. Phase C will complete the northern street edge of the internal road on site known as ‘George Junction’, as well as the Coast Capital Plaza next to Phase A. The completed plaza is intended to allow for retailer displays and seating, while serving as a direct pedestrian connection through the Hub development to King George Station.

‘Phase C’ shown behind the existing Coast Capital Savings headquarters and to the left of currently under construction ‘Phase B’ View of ‘Phase C’ from King George Blvd View of ‘Phase C’ from the east looking towards King George Station View of Coast Capital Plaza between Phase A and C – connecting Hub to King George Station

In terms of architecture, the tower’s design references the pair of 29 & 40-storey residential towers currently under construction as part of Phase B, with a similar wide rectangular floor plate, and prominent canopy at the top of the tower. Phase C differs however with a more ‘playful’ design, featuring shifting coloured balconies every other floor for visual interest, and a light grey window wall running down the narrow north and south sides of the tower. Punctuated black-framed windows and white paneling cover the wider east and west facades.

The retail podium of the tower also aims create visual interest and promote a human-scale environment through varied heights and materials used for each of the retail units. This reinforces a small-scale retail rhythm along the street for a comfortable and pleasant pedestrian experience.

Punctuated windows and varied coloured balconies along east and west facades View from east towards King George Station Retail fronting Coast Capital Plaza between ‘Phase C’ and Coast Capital Savings headquarters View facing west of retail along George Junction – featuring varied materials and podium heights

Phase C marks the second to last phase of King George Hub – to be followed by Phase D on the remaining lands on the east end of the site. Phase D is expected to include up to 3 additional towers, bringing the total number of towers within King George Hub to 9. While it is unclear when Phase D will move forward, Phase C is expected to begin construction by next year, with occupancy targeted for summer 2022.

King George Hub lands with ‘Phase C’ site in green and future ‘Phase D’ site to the east North elevation view of Phases A-C East elevation view of Phase A-C

For more on Phase C of King George Hub: https://www.surrey.ca/bylawsandcouncillibrary/PLR_7918-0095-00.pdf

Concord Pacific has launched marketing for its next and final phase of its ‘Park’ development near King George Station. Named ‘Park George’ following Park Place, Park Avenue, and Park Boulevard, the twin tower project is now open for registration on the Park George website.

The project which received 3rd reading on June 25, 2018 and Final Adoption just a month later on July 23, 2018, has moved swiftly through the approvals process, and is expected to begin construction within the coming year. As reported back in June, the project will feature a pair of 35 & 39-storey towers adjacent to, and integrated with, Quibble Creek Park at 13778 100 Ave.

Completion is targeted for Spring 2022.

The next phase of Concord Pacific’s ‘Park’ community near King George Station is moving forward to Council on June 11 seeking approvals to develop a pair of 35 & 39 storey towers at 13778 100 Avenue. Located just to the east of their recently completed ‘Park Avenue’ towers, this latest, so-far unnamed project, will be the 4th phase of Concord’s ‘Park’ community following Park Place, Park Avenue, and the now under construction Park Boulevard. The 2 new towers will bring the total number of Concord towers in the community to 8. The ‘Park’ name refers to the community’s setting surrounding Quibble Creek Park.

From the Planning Report to Council, Concord is proposing to subdivide the site into 2 lots – the north lot to contain the 2-tower project, and the south lot to be conveyed to the City as an addition to Quibble Creek Park. The northern-most tower fronting 100 Avenue will be 35-storeys (348 ft), while the southern tower will be 39-storeys (377 ft.), containing a total of 676 units, above a 2-storey podium consisting of indoor and outdoor amenity space, as well as 7 ground-oriented townhouse units fronting 100 Avenue.

As for design – the towers feature balconies that vary in size, shape, and materials, to create visual interest. Vertical blue strips run down the towers fading from dark to light blue – referencing a waterfall. Other references to water include blue paving patterns containing in-ground lights and glass bricks within the pedestrian walkways leading from Quibble Creek Park to a water feature in the centre of a plaza. This water feature serves as a focal point that can be seen from the 100 Avenue entrance, the tower lobby, and greenway to the east.

The two towers will connect and integrate with Quibble Creek Park to the south, as well as the Park Avenue towers to the west through an expanded greenway / path system. A generous sized lawn along the greenway will be provided as flex space for residents. Large planting areas with naturalistic character will help to integrate the greenway into the naturalized landscape of Quibble Creek Park.

In addition to the project’s access to and integration with its natural park setting, other outdoor amenities to be provided on the podium’s roof include a sunbathing deck, outdoor yoga area, children’s play area and putting green. Indoor amenities include a gym, study and meeting room, pilates and exercise room, indoor pool, hot tub, steam room and sauna, change rooms, and table tennis.

PCI Development’s King George Hub project has officially sold out both residential towers within Phase B of the project. The 40-storey tower first went to market in October, quickly selling out, followed by the 29-storey tower in November. Phase B will also include a 15-storey office tower, 2-storey stand-alone restaurant, as well as over 100,000 sq.ft. of retail space integrated with a plaza.

According to the King George Hub Sales Team, over 12,000 people registered as interested purchasers for the 738 units. Given this unprecedented demand for a condo project in Surrey City Centre, units were allocated through a lottery system. Of those units sold:

  • 697 were purchased by local residents
  • 1 in 4 were first-time home buyers
  • 65% of buyers currently live within 20km
  • 30% of buyers currently live in Vancouver

With the success of King George Hub selling out so quickly, PCI developments has indicated that they are now moving forward with plans for Phase C of the project, which should include 1 additional residential tower to the east of the existing Coast Capital Savings headquarters. A future Phase D is set to follow that with space for up to 3 more towers, however detailed plans for both sites have yet to be finalized or released.

Plan showing King George Hub Phasing – Future phases C & D to the north and east of Phase B

With sales now complete, and final approval in place, it is expected that Phase B of King George Hub will begin construction by Spring 2018. This should be joined by Concord Pacific’s 42-storey Park Boulevard project just north of King George Station around the same time, making for 4 new towers starting construction within the area immediately surrounding King George Station. For more on King George Hub:

http://kinggeorgehub.com

Concord Pacific’s Park Avenue West has finally opened near King George Station in Surrey City Centre. The tower which began construction in 2014, is the taller twin to Park Avenue East which opened in late 2016.

Standing at 39 Storeys tall, Park Avenue West not only adds another condo tower to the area, but also completes the the Park Avenue development, bringing with it a number of resort-style amenities, new public plaza space, walkways open to the public, lighting features, and a corner fountain with spotlights that illuminates the building in changing purple and blue tones at night. Park Avenue is the successor to the original 3 Park Place towers at King George Station, and is set to be followed by Park Boulevard which is expected to break ground by next year.

The opening of Park Avenue has quickly given a new feel to the area. A walk through the new public plaza, pathway, and amenity areas provides a good sense the future feel of Surrey City Centre, and the King George Station area in particular, with the quality of urban design and landscaping on-par and comparable to areas of Coal Harbour and Concord Pacific’s False Creek neighbourhood. With a number of new developments set to break ground within the next year in the immediate vicinity, the area’s transformation will only continue.

New corner fountain at Whalley Blvd + 100 Avenue featuring coloured spotlights. View west along 100 Avenue of Park Avenue West lobby View east on 100 Avenue of Park Avenue West entrance View of the Park Avenue parking access area New public pathway connecting to Whalley Blvd Parking Garage entry and pool deck to the right View further back along new public pathway Private pool within Park Avenue amenity area Horizontal lighting feature on top of Park Avenue West and East Pool deck within private amenity area Amenity area tennis court along new public path Park Avenue West and East as seen from King George Station Park Avenue West and East with Park Place in forefront from King George Station Purple toned lighting feature on Park Avenue West as seen from 100 Avenue

For more on Park Avenue:

https://www.parkavenueliving.ca

Whalley District – UrbanSurrey

A development application has been submitted for a mixed-use tower at 10731 King George Blvd just south of 108 Avenue. The subject site is made up of 3 existing lots which currently contain a run-down 2-storey commercial/residential building, and a 1-storey medical clinic.

The subject application is proposing to consolidate the 3 lots into 1, rezone the site from CHI to CD (based on RM-135 and C-15), as well amend the City Centre Plan to permit a 345-unit mixed-use development. The site is currently designated ‘Mixed-Use (3.5 FAR)’ under the City Centre Plan. In addition to redevelopment of the site, the application would also dedicate a portion of future 107A Avenue just to the South. The 2 adjacent properties to the South are currently owned by the City for the purposes of completing this new road connection.

View of Site from King George Blvd Subject Site within City Centre Plan – Designated Mixed-Use 3.5 FAR

The subject site is located directly across King George Blvd from Tien Sher’s anticipated ‘Whalley District’ development, set to replace the recently closed-down Flamingo Hotel and Bar. Combined, both projects would mark the beginning of renewal and transformation of the area surrounding King George & 108 Avenue, which has become notoriously run-down over the past few decades. This area is designated as a ‘Historic District’ in the City Centre Plan, due to its historical significance as the place of Surrey’s early urban beginnings surrounding the former ‘Whalley’s Corner’ Gas Stop.

For more on the application:

https://apps.surrey.ca/Online-Development-Inquiry/?year=19&seq=0048

New renderings have been released by Adessa Visuals of Tien Sher Group’s upcoming Whalley District near 108th & King George Blvd. The 3-tower project which currently has preliminary approval, is expected to begin on its first phase – a 35-storey condo tower + 6-storey condo low rise with retail at grade – later this year.

Adessa Visuals specializes in creating photo-realistic architectural renderings for projects across Metro Vancouver. These latest renderings help to bring the project to life and visualize the finished product. From the renderings, it is clear to see how transformative of a project this will be for the area of 108th & King George Blvd – which has become notoriously run-down in recent decades. In addition to condos, the project will also bring retail, community arts space, and an outdoor plaza.

This development will add to developer Tien Sher Group growing number of buildings in the area, having already built the 5-storey Quattro buildings across the street on Whalley Blvd, and set to begin on another 5-storey project across from the site at Whalley Blvd & Grosvenor Rd by next year. Whalley District will be phased, starting with the 35-storey tower at the east end of the site, and then working west to complete the 37-storey, and finally 46-storey signature tower. While the first tower could begin later this year and complete by 2021, it is expected the entire development will not be complete until around 2025.

View looking North View looking north on 107A Ave towards proposed plaza on 136A St View looking south from King George Blvd View looking west from Whalley Blvd & 107A St at first phase of project featuring a 35-storey condo tower and 6-storey condo building with retail at grade.

For more on the project: http://www.surrey.ca/bylawsandcouncillibrary/PLR_7915-0305-00.pdf

A 5-storey condo building proposed for the corner of Grosvenor Road and Whalley Blvd received 1st & 2nd readings at Council Monday night. The project, which was first announced back in April 2017, and is being developed by Tien Sher, will become the developer’s 6th building in the area, after Quattro 1, 2, 3, Balance, and the now under construction Venue. Tien sher’s other major project in the area Whalley District, was recently approved back in June, and should begin construction on its first phase in 2018.

This latest building to be added to Tien Sher’s portfolio in the area will further help to transition the neighbourhood into an up and coming urban district close to Gateway Station. From the planning report to Council, the project is to consist of:

  • 125 Units consisting of 1-bedroom/flex, 2-bedroom/flex, and 3-bedroom apartments

Ground-oriented units are proposed to be oriented toward the street with their own front door, entry gates, and semi-private outdoor space, which will help to urbanize the streetscape that the building fronts. The project is expected to be completed by late 2019.

Project site within City Centre Plan

For more on the project:

http://www.surrey.ca/bylawsandcouncillibrary/PLR_7917-0110-00.pdf

Tien Sher Group’s long awaited ‘Whalley District’ is finally heading to Council on Monday June 12 for 1st & 2nd Readings. The project which first appeared in 2012 under a previous application, and then again in 2015 under its current application, is aiming to kickstart a revitalization of the historic heart of Whalley near 108th Ave & King George Blvd.

Details of the plan released in the Planning Report to Council indicate that the project will be built in 3 phases as outlined below:

Phase 1:

    • A 6-storey condo tower with retail at ground level fronting Whalley Blvd
    • A 35-storey condo tower with retail, arts, and plaza space below.
    • 4 live/work townhouse units
    • A 426-sq. metre (4,585-sq.ft.) street-level outdoor plaza at the intersection of future 136A Street and 107A Avenue. The plaza is intended to be used as a public gathering space where frequent weekend entertainment, education, and art events can take place. The applicant has proposed to partner with a non-profit arts and culture organization (Flamingo Square Arts Connection) to activate the space.

Phase 1 will include a total of 349 dwelling units. The commercial component for Phase 1 will consist of 1,960 square metres (21,095 sq.ft.) of floor area.

Phases 2-3:

  • A 37-storey condo tower with retail at ground level
  • A 46-storey condo tower with retail at ground level, including a large-format grocery store.

It is expected that Phase 1 of the project will get underway by Spring 2018.

Developer Tien Sher Group held a packed Town Hall meeting today to present their vision and plans for a revitalized Whalley. Dubbed ‘Whalley District’, the plan is for a development consisting of 3 high-rise condo towers and 1 low-rise condo building over a mix of commercial, retail, community, and plaza space on the south-east corner of 108 Ave and King George Blvd in the historic heart of Whalley. Tien Sher has already developed the neighbouring ‘Quatto’ project at Whalley Blvd and 108 Ave, along with ‘Balance’ on Grosvenor Rd, and the currently under construction ‘Venue’. 

While news of the development is not new, having been under application since 2015, what is new is their now announced plans to partner with a local arts group to bring a significant arts component to the project as a means to revitalize and bring culture to the Whalley area. It is expected that community space will be provided in the development for the non-profit arts group and their programming.

At the meeting, Tien Sher presented their plans for the introduction of a pedestrian-only street through the centre of the development dubbed the ‘Flamingo Block’ on what would be future 136A St. The Flamingo name comes from the long-standing Flamingo Hotel which has been on the site since the 1950’s, but will be torn down to make way for the development. At present, the City of Surrey wishes to see this as a future road open to traffic, however Tien Sher is leading a petition to build it as a pedestrian-only street where public art, cultural programming, and gathering could take place. This would compliment an additional proposed plaza/park on the corner of 108 & King George, also to be build as part of the development.

The project, which is expected to appear before council for preliminary approvals and public hearing before summer, is to be built in phases beginning with a 6-storey condo building with retail below along Whalley Blvd at the east end of the site. This will then be followed by phases 2-4 consisting of a 35-storey, 37-storey, and lastly a 46-storey condo tower(s) above commercial, retail, and arts/community space. It is expected that the first phase of the project will break ground by Spring 2018.

In the meantime, the arts group is looking to engage arts initiatives around the City Centre right away, and is seeking anyone who would like to become involved. Ideas for arts initiatives that can be introduced in the City Centre are wide ranging, from murals, public art, beatification projects, community groups, activities, and more.

For more information on Whalley District, to get involved, and to sign their arts & culture petition, visit: http://whalleydistrict.com

For more information and to get involved with the Flamingo Square Arts Connection, join their Facebook page: https://www.facebook.com/Flamingo-Square-Arts-Connection-754586634722551/

March 2021 Update – UrbanSurrey

The March Issue of the City Centre Update is now available at SurreyCityCentre.ca. This month’s newsletter includes a round-up of new Development Applications, Council Approvals, and Construction activity during the past month of February.

New Development Applications

There were no new major development applications submitted in City Centre during February 2021.

As of March 2021, there are 30 major development applications under initial review (pre-council), consisting of approximately 34 towers, and 21 low-rises.

Major development applications under initial review as of March 2021

Council Approvals

Two major projects received 3rd Reading (Preliminary Approval) from Surrey City Council in February 2021. These included GEC Education Mega Centre, a 49-Storey Mixed- use tower, and Bosa’s Brightside, a 4-tower mixed-use development ranging in heights from 38-51 Storeys.

As of March 2021, there are 34 approved major projects in City Centre, consisting of 43 towers, and 22 low-rises.

Approved major development applications as of March 2021

18 – 0350 | Brightside

Bosa’s Brightside re-appeared before Surrey City Council in February 2021 after having been previously approved back in March 2020. The application has been amended to include an additional tower (previously under a separate application), as well as some minor revisions to the original proposal. The application now consists of 4 towers (38, 46, 50 & 51-Storeys) surrounding 2 low-rise retail & amenity buildings, to be built over a number of phases. Phase 1 is to include a 38-Storey rental residential tower on the corner of City Parkway & 104 Avenue.

Address: 104 Ave & City Parkway
Proposal: 38, 46, 50 & 51-Storey Mixed-Use
(1,840 units, 239,421 SF office/retail)
Developer: Bosa BlueSky
Architect: Perkins + Will
Expected Completion: 2025 (Phase 1)

20 – 0071 | GEC Education Mega Centre

GEC Education Mega Centre also re-appeared before Surrey City Council in February 2021 after having been previously approved back in October 2017 under a separate application. The revised application now includes a 49-storey mixed-use tower consisting of 383 market

& rental residential units, 78,490 SF of office & institutional space, and 4,973 SF of retail. The project will also dedicate and construct a new portion of 102A Avenue through the site which is to eventually connect east to King George Blvd and beyond.

Address: 102A Ave & City Parkway
Proposal: 49-Storey Mixed-Use
(383 units, 83,468 SF office/retail, institutional)
Developer: CIBT / WestStone Group
Architect: Chris Dikeakos
Expected Completion: 2025

Construction

No new projects began construction during January 2021, however one project finished construction (Central City Parkade), and one project began demolition, after having been halted in Fall 2020 (La Voda – 6-Storey Residential).

As of February 2021, there are 16 projects under construction in City Centre, representing 15 high-rises (>6 Storeys) and 6 low-rises (4-6-storeys).

Major projects under construction as of March 2021 Camellia Seniors Living – 132 St & 109 Ave Georgetown One by Anthem beginning to transform the corner of 102 Ave & Whalley Blvd Linea nearing completion at the corner of 133 St & 104 Ave Surrey’s next tallest – One Central beginning to rise in West Village Excavation underway at Park George on 100 Ave Rosewood Supportive Housing project rising above ground on 137 St King George Hub residential towers and retail nearing completion along Fraser Highway City Centre 3 nearing completion at 96 Ave & 137A St

University District – UrbanSurrey

BlueSky Properties held a public sales launch event yesterday for the upcoming Phase 2 of University District. While the project is to include 2 towers above townhouses along University Drive between 104 Ave and 105 Ave, sales have so far only been opened for the shorter 28-storey north tower. It is expected that once that tower sells out, sales will then open for the taller 37-storey south tower.

Of the 322 homes released for sale in the north tower, it appears that most 1-bedroom units have already been sold out as of the public launch date – with prospective buyers asked to inquire with the sales team about availability.  What remains are:

  • Junior 2-bedrooms (646 – 732 SF) priced from $569,900
  • 2-bedrooms (764 – 850 SF) priced from $609,900
  • Townhomes (1249 – 1636 SF) priced from $799,900

If you’re looking for a 1 bedroom, you may have to wait for the launch of tower 2.

Model seen from University Drive + 105 Avenue Model seen from University Drive Model of commercial and amenity podium at University Drive + 104 Avenue

Expected to be complete by end of 2022, the 28-storey north tower will feature air conditioning in all units, 4 elevators, enhanced bike storage facilities, and more. While it isn’t clear whether the south tower will be constructed and completed within the same time frame (pending sales), it appears the commercial / amenity building at 104 Avenue and University Drive would be. In addition to retail at ground level, this building will feature a fitness centre for residents, outdoor rooftop pool, bbq and dining terrace, lounge and entertainment areas, and more.

North-West facing corner suite Balcony facing North-West

For more on University District:

ud.blueskyproperties.ca

Bosa Properties has submitted an application for their next phase of University District, to be located on the former Brick / Sears outlet site just north of the Safeway near 104 Avenue and City Parkway. This next phase is to follow Phase 2, known as ‘Blue Sky‘ which is currently in pre-sales and expected to begin construction in 2019.

Details of the new application indicate that the project is proposing 1,134 residential units and 104,300 SF of commercial space. This is likely to translate into up to 4 residential towers above podiums and significant commercial / retail space.

The site, which includes 2 properties – 13583 104 Ave & 13550 105 Ave spans an entire block, with frontages on 104 Ave, 105 Ave and City Parkway. The site also spans 2 designations under the City Centre Plan – with the south portion of the site designated for Mixed-Use/High-Rise (5.5 FAR), and the north portion designated for Mixed-Use/High-Rise (3.5 FAR). The City Centre Plan allows for density bonuses of 20%, meaning the project FAR will likely be proposed higher than what is designated.

View of Subject Site looking north-west from 104 Ave

The subject site is a key location in City Centre, in the civic core, just to the north of City Hall and Civic Plaza. Well-fitted to a project at this high profile location, the applicant on the file is Perkins + Will, a renowned international architecture and urban design firm with an office in Vancouver.

In development of the site, the project will also dedicate and construct a new urban ‘green lane’ running east-west across the site, as well as re-align the intersection of 104 Avenue and City Parkway. This will result in a continuous City Parkway between Surrey Central and Gateway – and help bridge the gap between these 2 areas of City Centre.

For more on the application:

https://apps.surrey.ca/Online-Development-Inquiry/?year=18&seq=0350

Bosa’s BlueSky Properties received 1st & 2nd readings by Council on Monday night for their upcoming, recently re-branded, ‘BlueSky’ project at 104 Avenue and University Drive. The project, previously thought to become the next phase of ‘University District‘ is now set for Public Hearing and 3rd reading (preliminary approval) on July 9.

Released in the Planning Report to Council on Monday were updated renderings for the project, superseding a previous design from the original 2011 application on the site. As part of the new 2018 application, tower heights have increased to 28 & 37 storeys, and incorporate a more contemporary ‘box-shaped’ architectural design. In addition, a new north-south lane will be dedicated along the site’s eastern property line, as per the City Centre Plan, helping to achieve a finer-grained road network.

View of proposed towers facing west View of proposed towers facing east Rendering of 3-storey townhouse podium fronting University Dr Rendering of amenity podium with ground floor retail and rooftop pool at 104 Ave & University Dr

Designed by Vancouver’s ZGF Architects, the two condo towers will contain a total of 742 units above a 3-storey townhouse base fronting both 105 Ave & University Dr, and 4-storey amenity podium with ground floor retail and rooftop pool at the corner of University Dr & 104 Ave. The project will create a strong urban streetscape along both University Dr and 105 Ave, and help transition density further northward from the city’s emerging civic core. The project is targeted for completion and occupancy by summer 2022.

For more on the application, the full Planning Report to Council can be found here:

https://www.surrey.ca/bylawsandcouncillibrary/PLR_7918-0058-00.pdf

Bosa Properties’ University District is progressing with work continuing on the interior as well as balconies, exterior finishing touches, and sidewalk. While not scheduled for completion until later this year, the building has already transformed the area, creating a very urban, downtown streetscape along 104 Avenue, which will only improve with opening of the building’s retail. According to Form Leasing’s website, there are 5 units available which have not yet been leased.

http://form.ca/universitydistrict.pdf

The construction hoarding has finally come down at Bosa Property’s University District at 104 Ave & University Dr. Work continues on the exterior and interior of the building as it gets a coat of white paint, new sidewalks, and other finishing touches.

No sign yet on what retail may be going in at street level. There are currently 5 retail units listed for lease on form.ca ranging between 490 – 922 sq.ft. The 2nd floor of the podium is up for lease as office space with a total of 5,603 sq.ft. Availability is set for Q1 2017.

http://form.ca/universitydistrict.pdf

The crane is now in the process of being removed from Bosa Properties’ Alumni Tower project in Surrey City Centre. Alumni Tower is the first of 8 towers planned as part of Bosa’s University District development along 104 Avenue between University Drive and King George Blvd. At 36 stories, it will contain 310 condo units, along with retail and office space. Completion is scheduled for Fall 2016.

For more on University District:
http://ud.bosaproperties.com

Photos by UrbanSurrey – June 6, 2016

King George Hub – UrbanSurrey

PCI Developments is moving ahead with the next phase of its master-planned King George Hub development at King George Station. Following the success of ‘Phase B’ which is currently under construction, ‘Phase C’ will add a 34-storey rental apartment tower with ground floor retail to the site just east of the completed Coast Capital Savings headquarters (Phase A).

Originally planned to be an office tower site, ‘Phase C’ is to include 371 residential units, above 9,322 SF of ground floor retail. Phase C will complete the northern street edge of the internal road on site known as ‘George Junction’, as well as the Coast Capital Plaza next to Phase A. The completed plaza is intended to allow for retailer displays and seating, while serving as a direct pedestrian connection through the Hub development to King George Station.

‘Phase C’ shown behind the existing Coast Capital Savings headquarters and to the left of currently under construction ‘Phase B’ View of ‘Phase C’ from King George Blvd View of ‘Phase C’ from the east looking towards King George Station View of Coast Capital Plaza between Phase A and C – connecting Hub to King George Station

In terms of architecture, the tower’s design references the pair of 29 & 40-storey residential towers currently under construction as part of Phase B, with a similar wide rectangular floor plate, and prominent canopy at the top of the tower. Phase C differs however with a more ‘playful’ design, featuring shifting coloured balconies every other floor for visual interest, and a light grey window wall running down the narrow north and south sides of the tower. Punctuated black-framed windows and white paneling cover the wider east and west facades.

The retail podium of the tower also aims create visual interest and promote a human-scale environment through varied heights and materials used for each of the retail units. This reinforces a small-scale retail rhythm along the street for a comfortable and pleasant pedestrian experience.

Punctuated windows and varied coloured balconies along east and west facades View from east towards King George Station Retail fronting Coast Capital Plaza between ‘Phase C’ and Coast Capital Savings headquarters View facing west of retail along George Junction – featuring varied materials and podium heights

Phase C marks the second to last phase of King George Hub – to be followed by Phase D on the remaining lands on the east end of the site. Phase D is expected to include up to 3 additional towers, bringing the total number of towers within King George Hub to 9. While it is unclear when Phase D will move forward, Phase C is expected to begin construction by next year, with occupancy targeted for summer 2022.

King George Hub lands with ‘Phase C’ site in green and future ‘Phase D’ site to the east North elevation view of Phases A-C East elevation view of Phase A-C

For more on Phase C of King George Hub: https://www.surrey.ca/bylawsandcouncillibrary/PLR_7918-0095-00.pdf

King George Hub Phasing Plan

A development application has been submitted for Phase ‘C’ of PCI Group’s ‘King George Hub’ at Fraser Hwy & King George Blvd next to King George Station. Details of the application indicate that Phase ‘C’ will consist of a single 34-storey mixed-use tower just to the east of Phase ‘A’ – the landmark 10-storey Coast Capital Savings headquarters built in 2014. No renderings of the tower have been released at this time, but the project is proposed to contain 363 residential units above 10,000 sq.ft. of ground-level retail.

With the application just submitted, it is expected that Phase ‘C’ will not likely begin construction until around 2020/21, around the time when Phase ‘B’ reaches completion. It could however be fast-tracked to begin sooner, given the strong response for Phase ‘B’ – which sold out both its residential towers in a matter of days. Phase ‘B’ is set to begin construction in the coming months, and will contain 29 & 40-storey residential towers, a 15-storey office tower, a 2-storey (9,376 sq.ft.) standalone restaurant next to the Coast Capital Savings Headquarters, and 112,535 sq.ft. of retail.

King George Hub Phases A & B – Facing North-West King George Hub Phases A & B – Facing North-East King George Hub Phase A & B – View North from King George Blvd View South of Phase ‘B’ Retail Plaza View South of Phase ‘B’ Retail Plaza 41st floor residential rooftop amenity area – Phase ‘B’

Following Phase ‘C’ will be the final phase of King George Hub – Phase ‘D’. No details of Phase ‘D’ have been released yet, but this last piece of the site at the corner of Fraser Hwy and Whalley Blvd is expected to add 2-3 more residential towers above retail. Full buildout of all phases is expected to be complete around 2025, and will be accompanied by numerous other surrounding projects – also expected to complete within that timeframe.

For more on King George Hub:
http://kinggeorgehub.com/

PCI Development’s King George Hub project has officially sold out both residential towers within Phase B of the project. The 40-storey tower first went to market in October, quickly selling out, followed by the 29-storey tower in November. Phase B will also include a 15-storey office tower, 2-storey stand-alone restaurant, as well as over 100,000 sq.ft. of retail space integrated with a plaza.

According to the King George Hub Sales Team, over 12,000 people registered as interested purchasers for the 738 units. Given this unprecedented demand for a condo project in Surrey City Centre, units were allocated through a lottery system. Of those units sold:

  • 697 were purchased by local residents
  • 1 in 4 were first-time home buyers
  • 65% of buyers currently live within 20km
  • 30% of buyers currently live in Vancouver

With the success of King George Hub selling out so quickly, PCI developments has indicated that they are now moving forward with plans for Phase C of the project, which should include 1 additional residential tower to the east of the existing Coast Capital Savings headquarters. A future Phase D is set to follow that with space for up to 3 more towers, however detailed plans for both sites have yet to be finalized or released.

Plan showing King George Hub Phasing – Future phases C & D to the north and east of Phase B

With sales now complete, and final approval in place, it is expected that Phase B of King George Hub will begin construction by Spring 2018. This should be joined by Concord Pacific’s 42-storey Park Boulevard project just north of King George Station around the same time, making for 4 new towers starting construction within the area immediately surrounding King George Station. For more on King George Hub:

http://kinggeorgehub.com

Bolivar Rd – UrbanSurrey

A transformative ‘Gateway’ project at the north end of City Centre along King George Blvd at Bolivar Rd received 1st & 2nd Readings at Council on Monday, and will now proceed to Public Hearing on January 13. The project, which has been in the planning stages for nearly 5 years, initially appeared before Council back in April 2018, but was referred back to Staff to work with the applicant on refining the proposal, and to determine a ‘significant amenity contribution’ in exchange for increased density on the site. Since then, the project, designed by Vancouver’s MCM Architects has undergone significant design refinements to create an ‘iconic’ gateway development consisting of 1,040 units within:

  • 37-Storey Residential Tower above a 7-Storey podium
  • 31-Storey Residential Tower above a 6-Storey podium
  • 26-Storey Residential Tower above a 6-Storey podium
  • Two 6-Storey Low-Rise Residential Buildings
  • A 5,673 sq.ft. Childcare Facility
  • A small Cafe

Under the current application however, only the 26-Storey Residential Tower, Childcare Facility, Cafe, and a large ‘Orchard Plaza’ will be built as a first phase at the corner of King George Blvd and Bolivar Rd. The remainder of the development will be subject to future detailed Development Permit applications. The first phase tower will consist of 239 units, with the Childcare Facility and Cafe at its base. The large interior ‘Orchard Plaza’ design by Vancouver’s PWL Partnership Landscape Architects is intended to “celebrate connections to local agriculture” and will incorporate fruit trees within moveable planters, in addition to seating, an open lawn space, playground space, and an interactive stormwater capturing feature.

View looking south on King George Blvd from Bolivar Rd View looking south along Barker St from Bolivar Rd View of interior ‘Orchard Plaza’ from Barker St Close-up view of interior ‘Orchard Plaza’ with interactive stormwater feature View of Cafe and plaza at corner of King George and Bolivar within Phase 1 Public realm entry into interior of site from King George Blvd View looking north along King George Blvd of landscaped sidewalk and bike path Proposed Phasing Plan Landscape Site Plan

Overall, the proposal is proposing a blended density of 4.2 FAR on the site, which exceeds the currently permitted 2.5 FAR in that area of the City Centre Plan, intended for 4-6-Storey development. As a condition of allowing the increased density, the developer is offering a significant community amenity contribution above and beyond what is required, as well as providing a significant number of ‘family-sized units’ of 2-bedrooms or larger.

In addition to the development itself, significant upgrades will be made to surrounding streets including an expansive new landscaped sidewalk and separated bike path along King George Blvd, and new dedication and construction of Barker Street to the north.

For more on the application:

https://www.surrey.ca/bylawsandcouncillibrary/PLR_7917-0397-00.pdf

Rapid Transit – UrbanSurrey

Public consultation is set to get underway this month for the proposed Surrey Langley SkyTrain (SLS) extension, as well as the future of rapid transit along 104 Avenue & King George Blvd.

In 2014, the regional Mayors Council identified Fraser Highway, King George Boulevard, and 104 Avenue as priority corridors for rapid transit South of the Fraser in the 10-Year Vision. Following a study looking at combinations of SkyTrain, LRT, and Bus Rapid Transit for the corridors, the Mayors Council decided on 27-km of urban-style LRT on dedicated track (separate from traffic) on each of the corridors to be built over 2 phases:

  • Phase 1: Surrey-Newton-Guildford Line on 104 Avenue & King George Boulevard
  • Phase 2: Surrey-Langley Line on Fraser Highway

With funding in place to cover the entire first phase, and construction set to begin this year – a last minute request was made in 2018 by Surrey’s new Council to the regional Mayors’ Council to suspend the Phase 1 Surrey-Newton-Guildford LRT line and re-direct funding to the Phase 2 Surrey-Langley line instead, while switching the technology of the Phase 2 line to SkyTrain. The Mayors’ Council voted to move forward with this request, and directed TransLink to begin planning work for SkyTrain on Fraser Highway while at the same time re-visit rapid transit plans for 104 Avenue and King George Boulevard corridors.

Proposed Surrey Langley SkyTrain route and conceptual stations

The switch of priorities to the Phase 2 Fraser Highway line and changing its technology to SkyTrain has had implications both in budget and timeline. The funding that was allocated for the full Phase 1 Surrey-Newton-Guildford LRT line has been identified as inadequate to fund the entire Fraser Highway SkyTrain extension to Langley. Pending a future round of funding (timeline unclear), the line may have to be phased, with the current funding getting the line potentially only as far as Fleetwood. Start of construction and delivery of new rapid transit South of the Fraser is also now delayed by approximately 2 years as a result of the switch.

Despite the funding and timeline uncertainties, planning work is nonetheless well underway for the new SLS line, which will need to involve a significant re-evaluation of land-use plans along the Fraser Highway corridor to support SkyTrain, completion of a number of supportive studies, and extensive Public Consultation. In a project update report to Surrey Council this week – a preliminary timeline was given for this work by TransLink, with start of service targeted for 2025.

To run concurrently with the SLS planning and consultation work will be a planning process to ‘refresh’ the South Fraser Rapid Transit Strategy for delivering the Mayors’ Council fully envisioned 27km of Rapid Transit along each of the Fraser Hwy, King George Blvd, and 104 Ave corridors. This refresh will look to re-examine and engage the public on what rapid transit along the remaining corridors could look like, now that SkyTrain has been chosen as the technology for Fraser Hwy. The 2013 Rapid Transit Alternatives Study identified Bus Rapid Transit (BRT) for these corridors based on a scenario with SkyTrain on Fraser Hwy. With much LRT planning work having now been completed however, for the 104 Ave and King George Blvd corridors, it’s possible that LRT could still be an option for them rather than BRT, especially given Surrey’s long-term rapid transit vision for an extensive LRT network on major arterials across the City.

The first round of Public Consultation on the SLS line and South Fraser Rapid Transit refresh gets underway on April 11 in Langley, with open houses in Surrey on April 15, 16, and 17. TransLink has also recently launched an online survey where you can voice your feedback on the proposed SLS line. Open House times are set for the following dates and locations between 3-8pm:

  • Thursday, April 11 – Langley City Hall
  • Monday, April 15 – Surrey Sport & Leisure Complex (Fleetwood)
  • Tuesday, April 16 – Surrey City Hall
  • Wednesday, April 17 – Newton Seniors Centre

More info on the land-use planning review process for the Fraser Highway Corridor being undertaken by the City of Surrey can be found here: https://www.surrey.ca/bylawsandcouncillibrary/CR_2019-R059.pdf

Since my last post on the differences between the proposed LRT and SkyTrain generated much discussion – I felt it would be good to highlight in more detail – the key land-use, route, and scope differences between the 2 routes, and why SkyTrain down Fraser Highway – makes no rational sense from a land-use or planning perspective.

LRT (Phase 1)

The proposed LRT route along 104 Avenue and King George Blvd serves Surrey’s City Centre, 2 largest Town Centres, and 2 most urban corridors, designated to handle the bulk of Surrey’s urban growth and revitalization over the next few decades. The 104 Avenue and King George Corridors contain numerous major trip-generating destinations which include:

  • Surrey City Centre – would be served by 4 LRT stations
  • Guildford Town Centre – Largest Town Centre in Surrey with existing high-rise residential, hotels, offices.
  • Guildford Shopping Centre – 3rd largest shopping centre in Metro Vancouver
  • Guildford – 104 Avenue Corridor Plan – Currently underway land-use plan which will direct increased density, growth, and revitalization along this key corridor linking City Centre and Guildford – would be served by 4 LRT stations.
  • Surrey Memorial Hospital – As well as the emerging Health & Technology District surrounding it would be served by 96th Avenue Station
  • Bear Creek Park / Surrey Art Gallery – and surrounding area would be served by 88th Avenue Station
  • Newton Industrial Area – Large employment area consisting of light industrial, business parks, commercial – would be served by 2 LRT stations.
  • Newton Town Centre – 2nd largest Town Centre in Surrey – already significant retail, offices and planned increased density/growth.

In addition LRT would create 2 vibrant multi-modal transfer hub stations at Surrey Central and King George – integrated into new urban plazas.

Multi-Modal Transfer Hub Station at Surrey Central integrated into Plaza Envisioned Newton Town Centre Plaza with LRT integration

SkyTrain (Phase 1?)

While it is unclear how far down Fraser Hwy SkyTrain could be extended given current funding, an extension to Langley is unlikely within the 1.65 Billion approved budget. As such, the Fraser Highway SkyTrain line would have to be phased, with Phase 1 likely going as far as Fleetwood, and future extension to Langley at a later undermined date (by 2030?). Such a SkyTrain extension down Fraser Highway makes absolutely no rational sense from a land-use or planning perspective. Fleetwood is Surrey’s smallest Town Centre, with no plans for any significant increases in density or growth. Fraser Highway is also a very low density, predominantly single family / strip mall corridor with few trip-generating destinations along the route. The only nodes of significance are:

  • Fleetwood Town Centre – Smallest of Surrey’s Town Centres. The current Fleetwood Town Centre Plan designates this area for modest urban growth, consisting of townhouses, village like commercial, and some 4-6 storey apartments.
  • RCMP E-Division / Jim Pattison Outpatient – The only major destinations along this route would be at the 140th & Fraser Hwy station (assuming a station is proposed at this location)
  • 152 & Fraser Hwy Commercial Area – Currently a low-density strip mall area with no current land-use plans underway for revitalization. A land-use plan to change the density in this area would be necessary given the introduction of rapid transit to the area. This would present a major change to the Surrey OCP and where future density/growth directed to in Surrey.

In addition, a Fraser Highway SkyTrain extension would lack any vibrant multi-modal transfer hub stations centered on plazas. A missed opportunity for city building / urban revitalization.

Likely 3-stop ‘Phase 1’ SkyTrain extension to Fleetwood with current funding Likely terminus of Phase 1 Fraser Hwy SkyTrain extension in Fleetwood

Timeline?

  • LRT is scheduled to begin construction in 2019 with the 10.5km Phase 1 completed by 2024.
  • SkyTrain would need to start from scratch in 2019, beginning with at least 2 years of design, planning, consultation. New land-use plans would have to be initiated along the route – as land-use must be planned in cohesion with rapid transit. A 5.5 km Phase 1 extension of SkyTrain to Fleetwood could likely be completed by 2026.

By 2030 – assuming a second round of funding is made available – there are 2 possible scenarios for rapid transit in Surrey:

Scenario 1 – Surrey’s 2030 Rapid Transit Network – LRT

Scenario 1 would see 27km of rapid transit built in Surrey, serving both the Guildford – Newton corridors, as well as the Fraser Highway corridor to Langley.

Scenario 2 – Surrey’s 2030 Rapid Transit Network – SkyTrain

Scenario 2 would see 15.5km of rapid transit built serving only the Fraser Highway corridor to Langley. Guildford and Newton – Surrey’s 2 largest and most urban centre’s would have no rapid transit. While Doug McCallum does mention a future SkyTrain extension down King George Highway to Newton – this is unlikely until the Langley extension is complete – so post 2030.

Best way to spend $1.65 Billion?

Each of these scenarios costs the same $1.65 Billion price tag.

  • Which option do you think provides more value to Surrey?
  • Which option will result in the most rapid transit for Surrey by 2030?
  • Which option will best integrate with the neighbourhoods it passes through, create a sense of place, and be a catalyst for vibrant communities? Rather than just a means of by-passing Surrey to get somewhere else.
  • Which communities should be prioritized for rapid transit?

Numerous community and business leaders joined Mayor Linda Hepner today to launch an 8-week LRT showcase, offering residents a first glimpse at Surrey’s future LRT. As part of the showcase, a prototype LRT train car has been brought in from Europe and put on display in the Central City parking lot next to King George Blvd. It will remain there for the next couple of weeks before being relocated to Newton Town Centre, Guildford Town Centre, and finally the Surrey Canada Day celebration in Cloverdale.

The goal of the showcase is to give residents a first-hand look at what the urban-style LRT train will look like. Unlike high-floor commuter-type LRT trains like those in Calgary and Edmonton, Surrey’s LRT will be low-floored, similar to those found in many cities throughout Europe, and even Toronto. Despite being more integrated with the urban environment, the trains will nonetheless run on a dedicated right-of-way, apart from traffic, offering significant improvement over a bus – not only in speed, but also through more consistent/reliable schedules, frequency, capacity, boarding doors, and comfort. It is important to point out that the particular train car brought in for display is just a prototype, and the actual trains chosen for the Surrey line, will likely look a bit different.

LRT was chosen as the mode of choice for rapid transit in Surrey following years of study that began as far back as 2010. Numerous options, and combinations were looked at including LRT, SkyTrain, and Bus Rapid Transit. The results found LRT to be the most cost effective system for Surrey – with 27km of LRT track (2 lines) able to be built for the same $2.2 billion price tag as 16km of SkyTrain (1 line). Surrey gets a more extensive rail transit network, better integrated with the community, creating more pedestrian-orientated streetscapes, with LRT. Further, operating costs for LRT were found to be $6 million cheaper annually, with negligible differences in travel times.

April 2021 Update – UrbanSurrey

The April Issue of the City Centre Update is now available at SurreyCityCentre.ca. This month’s newsletter includes a round-up of new Development Applications, Council Approvals, and Construction activity during the prior month of March 2021.

New Development Applications

There were no new major development applications submitted in City Centre during March 2021.

As of April 2021, there are 30 major development applications under initial review (pre-council), consisting of approximately 34 towers, and 21 low-rises.

Major development applications under initial review as of April 2021

Council Approvals

No major projects received 3rd Reading (Preliminary Approval) from Surrey City Council during the past month of March, in part due to Spring Break.

As of April 2021, there are 33 approved major projects in City Centre, consisting of 42 towers, and 22 low-rises.

Approved major development applications as of April 2021

Construction

One new project began construction during March – A 23-storey market residential tower known as Centra by Everest Group located on 101 Ave at 139 St.

As of April 2021, there are 17 projects under construction in City Centre, representing 16 high-rises (>6 Storeys) and 7 low-rises (4-6-storeys).

Major projects under construction as of April 2021 30-Storey Georgetown One rising amidst the backdrop of King George Hub Parker by Mosaic progressing on 105 Ave near 140 St 44-Storey One Central rising above its podium on 133A St at Central Ave King George Hub office tower nearing completion at new intersection of King George Blvd and George Junction New road, bike path, and sidewalk along George Junction King George Hub office tower entrance fronting King George Blvd Legion ‘Veterans Village’ / Parc Centrale rising above City Parkway at 105A Ave 41-Storey Park Boulevard nearing completion along Whalley Blvd
Maverick nearing occupancy at Whalley Blvd & Grosevnor Rd

King George Hub ‘Phase B’ sells out – UrbanSurrey

PCI Development’s King George Hub project has officially sold out both residential towers within Phase B of the project. The 40-storey tower first went to market in October, quickly selling out, followed by the 29-storey tower in November. Phase B will also include a 15-storey office tower, 2-storey stand-alone restaurant, as well as over 100,000 sq.ft. of retail space integrated with a plaza.

According to the King George Hub Sales Team, over 12,000 people registered as interested purchasers for the 738 units. Given this unprecedented demand for a condo project in Surrey City Centre, units were allocated through a lottery system. Of those units sold:

  • 697 were purchased by local residents
  • 1 in 4 were first-time home buyers
  • 65% of buyers currently live within 20km
  • 30% of buyers currently live in Vancouver

With the success of King George Hub selling out so quickly, PCI developments has indicated that they are now moving forward with plans for Phase C of the project, which should include 1 additional residential tower to the east of the existing Coast Capital Savings headquarters. A future Phase D is set to follow that with space for up to 3 more towers, however detailed plans for both sites have yet to be finalized or released.

Plan showing King George Hub Phasing – Future phases C & D to the north and east of Phase B

With sales now complete, and final approval in place, it is expected that Phase B of King George Hub will begin construction by Spring 2018. This should be joined by Concord Pacific’s 42-storey Park Boulevard project just north of King George Station around the same time, making for 4 new towers starting construction within the area immediately surrounding King George Station. For more on King George Hub:

http://kinggeorgehub.com