New details released for ‘Central City 2’ office tower – UrbanSurrey

Blackwood Partners, have released new details on their upcoming ‘Central City 2’ office tower project at the corner of Old Yale Rd and King George Blvd. A new leasing brochure, available on the Central City website, provides some updated renderings, floorplans, and marketing information aimed at future tenants looking for office and retail space.

Since first being announced back in November 2017, the new renderings depict a re-designed, more refined tower, from that initially conceptualized. The new design features a stronger podium fronting Old Yale Rd and a more cohesive tower floor-plate and massing compared to the previous design. The rectangular floor plate blends into an elliptical floor plate on higher floors – referencing the existing 25-storey Central City office tower at 102 Ave & University Dr built in 2003.

Conceptual rendering of tower podium and restaurant at corner of City Parkway and Old Yale Rd

Tower Details

Designed by Vancouver’s ZGF Architects, the project will be a 25-storey, Class AAA, mixed- use tower, containing 512,305 SF of commercial space and +/-20,000 SF of retail space contained within the podium. The ground level is conceptualized to contain 6 retail units, a restaurant, cafe, and office tower lobby, anchored to a prominent public plaza at the corner of Old Yale Rd and King George Blvd across from Holland Park and King George Station. The building will be built to LEED GoldDesign (with a pathway to Platinum), and also contain:

  • Premium end-of-trip facilities, with ample bicycle storage, executive bicycle lockers, shower, and change facilities
  • Approximately 900 underground parking stalls
  • High-speed state-of-the-art elevators
  • Electric vehicle charging stations and car share parking spaces.
  • Numerous other advanced technology features

Conceptualized ground-level floor plan Artistic rendering of views from higher-level office floors Artistic rendering of roof-top views overlooking Holland Park Artistic rendering of fitness facilities for office employees

Long-term plan

Also released as part of the leasing brochure is a glimpse at the long-range plan for redevelopment of the entire Central City site following Central City 2. This plan will see much of the existing indoor shopping centre retained but renovated, with the introduction of a new prominent plaza at its south-end along Old Yale Rd, linking the shopping centre directly onto Holland Park. The existing parking lot along King George Blvd is envisioned to be broken up into a series of new city blocks, containing mixed-use high-rise development sites. A re-aligned City Parkway will connect directly through the site from the north, past a new entry plaza where Wal-Mart currently exists.

While no target dates have been given for completion of Central City 2 – it is expected that a development application will be submitted for the project in the near future. The long-range plan for Central City is expected to play out over the next decade or longer. For more on Central City 2:

http://www.centralcity.ca/wp-content/uploads/2018/04/Tower-2-at-Central-City-Brochure-April-2018.pdf

City Centre 2 opens in Health & Technology District – UrbanSurrey

Lark Group’s City Centre 2 held its grand opening today following the completion of the 185,000 square-foot, 12-storey LEED Gold certified office building. City Centre 2 is the second of 8 phases in Lark Group’s vision for an emerging Health & Technology District also referred to as ‘Innovation Boulevard’ just to the north of Surrey Memorial Hospital.

Anchoring City Centre 2 will be Surrey-based Safe Software, who will occupy the top five floors of the tower. Their brand new office space includes a state-of-the-art 4,000 square-foot cafeteria, a 6,000 square-foot roof-top garden terrace and green space with a multi-level deck and walking path, a well as a fully equipped fitness centre and amenities for their employees. Illuminated signage for Safe Software was installed on the top of the tower earlier this year.

In a speech at today’s opening ceremony, Lark Group president Larry Fisher indicated that construction could be underway on City Centre 3 as early as this summer.

25-Storey ‘The Holland’ heads to Council – UrbanSurrey

Townline’s upcoming project ‘The Holland’ on Old Yale Rd at 133 St near Holland Park is heading to Council Monday for 1st & 2nd readings. The 25-storey condo tower has been under application since 2014, but is finally moving forward after years on hold.

According to the Planning Report to Council, the tower and its base of townhomes are to be Phase 1 of a two-phased development of the site, which includes 4 properties along Old Yale Rd between 133 St and University Dr. The 25-storey phase 1 will occupy the western portion of the site, with a future Phase 2 to replace the existing 6-storey Kinsman Place Lodge on the eastern portion of the site. The Kinsman Place Lodge is a care facility currently operated by Fraser Health, scheduled to close in March 2019.

Subject Site at Old Yale Rd & 133 St 3D View of Subject Site containing existing Kinsman Place Lodge

In total, the development is proposed to contain 250 units, consisting of 145 one-bedroom units and 96 two-bedroom units within the 25-storey tower, and 9 townhouse units in a 3-storey base along Old Yale Rd and 133 St. The development will also dedicate and construct the start of a new north-south road between Phase 1 and the existing Kinsman Place Lodge (future phase 2) – helping to achieve the goal of a finer-grained road network in the City Centre.

In exchange for density, the developer is proposing an enhanced public realm along Old Yale Rd reflecting its heritage as one of Surrey’s earliest roads. This is to include 2 new corner plazas at either end of the development, as well as an increased setback from the street, double sidewalks, enhanced tree planting and landscaping, high quality surface materials, and the use of heavy timber cedar benches reflecting the logging history of the area.

Proposed Landscape Plan containing enhanced public realm along Old Yale Rd Elevation of proposed 25-storey tower along Old Yale Rd East and West elevations of proposed tower

A sales centre for the tower is expected to open across the street from the site to the south of Old Yale Rd in the fall, with construction expected to begin in 2019, and completion / occupancy targeted for Spring 2021.

For more on the application:

https://www.surrey.ca/bylawsandcouncillibrary/PLR_7914-0208-00.pdf

Concord Pacific’s final ‘Park Place’ tower heading to Council Jan 16 – UrbanSurrey

Concord Pacific’s final tower as part of their ‘Park Place’ development is heading to Surrey Council on Monday for Development Permit and Development Variance Permit. While the 42-storey tower is on the same site as the 3 original ‘Park Place’ towers, it’s been known since late last year that it will be marketed as a separate project ‘Park Boulevard‘ instead.

The tower will finally complete the block to the adjacent north of King George Station, adding a row of townhomes along Whalley Blvd across from Quibble Creek Park, and provide new public plaza space connecting to the existing Park Place plaza, retail, and transit station. In total the project will add 419 new residential units to the area. While similar in design to the original 3 towers, it will be differentiated through the use of contrasting charcoal and white coloured materials, and slightly different massing. Its height at 42 storeys will also help to punctuate the “table top” skyline in the vicinity.

With the DP and DVP moving forward, and the tower already under marketing it’s possible that the project could see start of construction by the end of the year or early 2018.

http://www.surrey.ca/bylawsandcouncillibrary/PLR_7916-0360-00.pdf

Updated plans and station concepts unveiled for Surrey LRT – UrbanSurrey

The City of Surrey began a series of 3 open houses on Thursday for Phase 1 of the upcoming Surrey LRT project. This latest public engagement is the 3rd round of open houses on Phase 1 the project, providing refined plans based on public input from previous consultations. Presented at the open house were preliminary station designs, road designs, information on construction planning, environmental and socio-economic study results, and more. A full set of the Open House Boards can be found here.

Station Designs

Overall, stations are designed to be highly visible, well-lit, and well integrated into the community – accessible by well-marked pedestrian crossings providing universal accessibility for all riders. Lengthy platform shelters protect riders from weather, and include space for ATM’s, information boards, seating, and more – while maintaining a clear line of sight to the street and approaching trains. Stations will in most cases be located in the centre median of the street, with the exception of King George, Surrey Central and Newton Town Centre – where they will be plaza oriented, or off to the side. Public art will also be integrated into stations along the route.

Roadway Design

LRT will run on its own dedicated track for the entirety of the line, with the exception of City Parkway where it will be integrated into a pedestrian plaza. Placement of the LRT track will vary – typically located in the centre median for most of the route, but off to the side in some sections.

Roadway design for 104 Avenue will consist of LRT in the centre median, and 1 traffic lane in each direction, widening to include an additional turning lane at major intersections. The 104 Avenue design will also provide upgraded and enhanced sidewalks, pedestrian crossings, and connections to stations. Currently 104 Avenue functions as a non-pedestrian friendly, busy arterial for cars. A re-purposed 104 Avenue with LRT will transform the street into a calmed, pedestrianized and transit-oriented corridor, supported by multi-family housing and streetfront shops along the route. The newly widened 100 Avenue and existing 108th Avenue corridors will become the new car-prioritized east-west routes between City Centre and Guildford while 104 Avenue will be the pedestrian/transit prioritized corridor.

Roadway design for King George Blvd will retain 2 traffic lanes in each direction while allowing for LRT in the median for the majority of the route. Sections of King George in City Centre will see LRT routed off to one side. New separated bike lanes, enhanced sidewalks, and pedestrian crossings will also be a key component of the re-designed King George.

Pedestrianized Plazas at Surrey Central & King George Stations

Taking inspiration from leading cities around the world, Surrey Central and King George Stations in City Centre are designed to be integrated into new pedestrianized public plazas. These plazas will help to create vibrant transfer points between LRT and SkyTrain’s expo line, similar to plaza’s found throughout Europe with multi-modal rail connections running through them. 

Socio-Economic Study: Improved Travel Times

A key finding of the socio-economic study released at the open house, was the improvement in travel times that LRT will offer over the existing 96 B-Line bus service, as well as private automobile. Under Section 7.2 of the study it was found that the existing 96 B-Line service between Guilford-Newton currently takes 29 minutes under ideal conditions. During periods of congestion however, this trip can take longer than 50 minutes. Further, this travel time is expected to worsen as population grows. LRT is able to cut this travel time by up to half, taking a consistent 27-minutes every time, on opening day, and a decade later, due to its dedicated track. In addition to this, LRT offers faster service and improved experience due to:

  • More doors for boarding, significantly reducing stop times at stations, and travel times overall.
  • Nearly twice as frequent peak service as the existing 96 B-Line peak bus service.
  • A smoother, more comfortable ride than B-Line bus, with less stop and go.

96 B-Line subject to traffic congestion – travel times between Guildford and Newton up to 50 mins during peak hours.

Integration with the Community

One of the key benefits of LRT is its integration with the community and streetscape compared to SkyTrain. While SkyTrain serves well as a long distance commuter rail service, LRT is better suited to more localized routes in the region – similar to other cities where there are various tiers of rail transit making up the regional transit network.  Not every line in a city needs to be the same type of rail transit – LRT, Subway, and Commuter Rail are often combined to compliment each other and serve different needs. The introduction of LRT to Metro Vancouver represents a maturing of our rail transit network into a multi-modal system, and it is very likely we will see LRT implemented elsewhere in the region following Surrey.

In Surrey, the 104 Avenue and King George Highway corridors that make up the ‘L’ line are much better suited to urban-style LRT than SkyTrain. Not only is this route more localized than regionally serving, but SkyTrain just doesn’t make sense from a cost perspective, and the impacts that such guideways would have on the streetscapes. Looking at a comparison between SkyTrain guideways in Richmond City Centre and Coquitlam City Centre, it is clear to see how much better LRT integrates with the streetscape and community it passes through, rather than bisecting it with an obtrusive, shadowing, and noisy concrete structure. LRT can transform a streetscape into an inviting, pedestrian friendly, vibrant urban environment – whereas SkyTrain does the opposite. 

Impact of SkyTrain guideways on the urban environment/streetscape vs urban-style LRT

For more on Surrey LRT:

https://surreylightrail.ca

‘Central City 2’ mixed-use AAA office tower announced at Invest Surrey keynote event – UrbanSurrey

Invest Surrey held an inaugural launchpad event today at Surrey City Hall hosted by Mayor Linda Hepner, featuring a number of speakers and panelists, discussing the future of Surrey and investment opportunities in the rapidly growing and changing city. The event was structured around a number of topics throughout the course of the day on the keynote theme ‘Transformation 2.0’ covering:

  • Entertainment & Lifestyle
  • Digital Information & Communication Technology
  • Research & Development/Innovation
  • Industrial, Transportation, & Logistics
  • Housing Diversity

‘Central City 2’ Announced

At the event, a few major announcements were made, including an announcement by Blackwood Partners, owners of the Central City office, shopping centre, and university complex, that they will be moving forward with a successor tower named ‘Central City 2’.

While few details have been released so far, what is known is that the tower is proposed as a AAA mixed-use office tower at the corner of King George Blvd & Old Yale Rd on the site of what is currently a former Best Buy. The tower is situated directly across from Holland Park as well as King George Skytrain Station to the south. A rendering released at the event shows a oval shaped tower similar to the original Central City tower, fit within a more rectangular outer shell. There is also a large curved podium and generous plaza space meeting the intersection and extending underneath the podium

According to the City Centre Plan, the tower will occupy an entire new block, with a new lane proposed to the north of the building. This proposal sets the stage for the redevelopment of the remaining parking lot along King George Blvd into similar sized blocks, perhaps with a ‘Central City 3’ tower to follow at 102 & King George Blvd in the future.

‘Central City 2’ site within City Centre Plan

It’s unclear at this time who Blackwood Partners is working with as an Architect, or partnering developer, or how soon this proposal could get moving. As of now, no application has yet to appear on Surrey’s COSMOS mapping information system. The project also has yet to appear before Surrey’s Advisory Design Panel (ADP), meaning the design pictured in the rendering could still undergo revision.

Upon submission of an application, it could likely take up to 2 years before we see construction begin, and another 2-3 years to build. The project could perhaps move faster if fast tracked under Surrey’s Nexus program, but likely completion won’t be until the early 2020’s.

New Art Gallery Announced

In addition to the ‘Central City 2’ office tower announcement, it was also announced that the Surrey Art Gallery will be relocating to Surrey City Centre as a new ‘Interactive Art Museum’ slated to become the largest of its kind in Canada.

More details on both the ‘Central City 2’ tower and new Interactive Art Gallery as they come.

For more on Invest Surrey’s event today:

https://investsurrey.ca/launchpad