Holland Parkside to bring mix of Housing, Office, Retail, and Public Market – UrbanSurrey

A new mixed-use development proposed for a vacant piece of land next to Holland Park is set to appear before Council on Monday, February 24 for 1st & 2nd Readings. Known as Holland Parkside, and being developed by Century Group (the same developer as 3 Civic Plaza), the project is proposing to bring a mix of market and rental housing, office, retail, restaurant, public food market, and courtyard green space to the growing neighbourhood surrounding King George Station. Overall, the project is to include:

  • 42 + 36 Storey Market Residential Towers above a townhouse base (818 Units)
  • 19-Storey Rental Residential Tower (204 Units)
  • 10-Storey Mid-Rise Office Tower (212,000 sq.ft. including retail)
  • Ground-level Retail in a double-height podium at the base of the office and rental towers along King George Blvd, including a 2-storey restaurant and large market hall for food vendors
  • A publicly accessible Central Courtyard on level 3 with an urban agriculture and food-related theme

Perspective along King George Blvd – Rental Residential Tower (Left), Office Mid-Rise (Right), and 2-Storey Retail / Market Hall Podium Perspective along west side of site adjacent to existing Single Family – Market Residential Towers and Townhouse Base Perspective along 99 Ave – Office Mid-Rise (Left) and Market Residential Tower (Right) Perspective along 98A Ave – Market Residential Tower (Left), Rental Residential Tower (Right), Level 3 Courtyard (Centre) A publicly accessible courtyard on level 3 in the centre of the site, accessible via a grand staircase through the site from King George Blvd

Designed by ZGF Architects, the development is to be built in phases over a number of years, subject to market conditions. The current application is for a Rezoning, City Centre Plan Amendment, and General Development Permit (for Form & Character) only. Detailed Development Permits for each phase will be brought forth at later dates under separate applications.

At the south end of the site, a small portion of land will be dedicated to allow for 98A Avenue to bend northward and intersect with ‘George Junction’ a new crescent road to connect through the King George Hub development across the street. At the north end of the site, a new 99 Ave will be constructed, which will then bend south around the development to connect to 98B Ave to the west. The existing single family housing to the west is expected to be redeveloped in the future to 4-6 Storey multi-family, as per the City Centre Plan.

Contextual view facing North-West Contextual View facing South-East Contextual View facing North-East

At this time, detailed design of project is still underway, and will continue to be refined through subsequent development permit applications for each phase. The report to Council notes that the first phase is expected to be constructed and ready for occupancy by summer 2024, although does not mention which portion will be developed first. Given that all 4 buildings share a common parkade, podium, and level 3 Central Courtyard, it’s unclear how the project would be built in phases.

For more on the project:

https://www.surrey.ca/bylawsandcouncillibrary/PLR_7918-0217-00.pdf

26-Storey ‘CityWalk’ receives Preliminary Approval – UrbanSurrey

A 26-Storey residential tower proposed at Central Ave and 133 St in the growing West Village neighbourhood received Preliminary Approval following Public Hearing on January 13. The project, named ‘CityWalk’ and being developed by Huacheng Holdings is located directly across from the new West Village District Energy Centre and Park, as well as the recently completed Evolve tower.

Designed by Wilson Chang Architect, the project is to include 223 units within a 26-storey tower above a 4-storey podium with ground-oriented townhouse units at the base fronting along Central Ave and 133 St. The building is intended to transition height from taller towers east of the site, down to a low to mid-rise form west of the site along 132 St at the edge of City Centre.

Perspective view looking north-east with 36-storey Evolve across the street View facing south-west from 133 St & Central Ave View facing north from proposed Public Pathway View facing north west from 133 St

As part of the Landscape Plan prepared for the site by Vancouver’s ETA Landscape Architecture, a public walkway is proposed along the south side of the building, lending the project its name. This pathway will connect to an existing public walkway across the street to the east between the Evolve and Ultra towers, and eventually extend further east through to Civic Plaza as more projects develop. A green-roof is also proposed as part of the plan on top of the low-rise podium.

Additionally as part of the project, Central Avenue will see its remaining south half dedicated and constructed west of 133 St for the length of the site, inclusive of a separated bike lane to match the already constructed north side of the street.

Having now received 3rd Reading, the project can be expected to receive Final Approval within a year, and completion likely by 2024-5.

For more on the project https://www.surrey.ca/bylawsandcouncillibrary/PLR_7918-0125-00.pdf

City Centre Newsletter – UrbanSurrey

UrbanSurrey is transitioning to a monthly newsletter in partnership with the Downtown Surrey Business Improvement Association. The newsletter will be available on a monthly basis via the SurreyCityCentre.ca website. There you will find information and resources on the continued growth and transformation of Surrey’s new City Centre.

The monthly newsletter will be available under the Development Updates section of the website. A link to October’s newsletter can be found at the link below, providing an overview of current applications, approvals, and construction within City Centre:

Surrey City Centre Monthly Update – October Newsletter

The current projects section of this blog will continue to be updated on a periodic basis.