Passages by Rize heads to Council – UrbanSurrey

Vancouver developer Rize is set to bring their latest and most ambitious project to date before Surrey Council on Monday for 1st & 2nd Readings, and approval to proceed to Public Hearing. Passages as it’s called, is a proposed master-planned mixed-use development at 10138 Whalley Blvd consisting of market condos, market rental apartments, retail, and daycare space, all situated within a European-style ‘piazza’ public plaza. In total the project is proposing:

  • 3 High-Rise towers and 1 Low-Rise (6, 23, 32 & 39 Storeys) containing 954 Market Condo Residential Units
  • 2 Mid-Rise towers (13 Storeys each) containing 172 Market Rental Residential Units
  • 18,116 sq.ft. of Ground Level Retail Space
  • 4,252 sq.ft. of Daycare Space
  • A 69,602 sq.ft. Publicly Accessible ‘Piazza’-Style Public Plaza

Rendering of central public ‘Piazza’ space within Passages development

Designed by London, UK based Alison Brooks Architects, Passages brings a fresh departure from the standard point tower above podium form, commonly found throughout Metro Vancouver. Instead, the project consists of 6 irregularly-shaped buildings of varying heights, clustered around a ‘Piazza’-style public plaza.

The design takes inspiration from coastal BC forests, incorporating references to ‘textured tree bark’ on building facades, and the use of earth tones and materials. Interspersed single and double-storey units are present throughout the towers, adding variation in form and glazing pattern. The 6-storey building is a modern interpretation of the traditional ‘British mansion block’ merged with ground floor townhouses.

The site’s perimeter and courtyard are structured as open, barrier-free spaces that the public and residents can share and enjoy. A series of four distinct piazzas, City Piazza, Park Piazza, Central Piazza and Neighbourhood Piazza, are linked by narrow urban groves between buildings and enriched streetscape edges.

The Landscape Architect on the project is Vancouver’s PWL Partnership tasked with designing the publicly accessibly open spaces comprised of the four landscaped piazzas. These spaces are animated with community agricultural gardens, an urban square with seating, a children’s play area, a great lawn for event and performance space, a yoga and exercise zone, a community harvest table, and an outdoor barbeque and games table space to encourage the public and residents to interact and socialize.

Passages will replace two existing and aging, wood-frame, 4-storey apartment buildings known as Fraserview Court, built in the 1970’s. Rize is proposing to offset the loss of the 154 existing rental residential units on site by providing 172 new rental residential units in two new 13-Storey concrete mid-rises as part of re-development. These rental units will be secured for a period of 20-years, through a Housing Agreement with the City. Rize is also assisting existing residents facing displacement through a City policy directed Tenant Relocation and Assistance Plan.

The project is proposed to be built in 3 phases, which includes:

Phase 1 (Targeted Completion: May 2023)

  • 13-Storey Mid-Rise with Market Rental Residential (88 Units), Ground Floor Cafe, and Daycare
  • 23-Storey High-Rise with Market Condo Residential (212 Units)

Phase 2 (Targeted Completion: June 2024)

  • 6-Storey Low-Rise with Market Condo Residential (66 Units)
  • 32-Storey High-Rise with Market Condo Residential (304 Units), and Ground Level Retail

Phase 3 (Targeted Completion: August 2024)

  • 13-Storey Mid-Rise with Market Rental Residential (84 Units), and Ground Level Retail
  • 39-Storey High-Rise with Market Condo Residential (372 Units)

In terms of approvals, the development is seeking:

  • City Centre Plan amendment to increase density on the site from 3.5 FAR to 5.5 FAR
  • Official Community Plan amendment to increase density on the site from 3.5 FAR to 5.5 FAR
  • Rezoning from Multiple Residential 45 Zone to Comprehensive Development Zone (Based on RM-135 & C-8)
  • Subdivision from 1 to 3 lots
  • Development Permit to allow for 3 High-Rise Buildings, 2 Mid-Rise Buildings, and 1 Low-Rise Building.

For more information on Passages:

https://www.surrey.ca/bylawsandcouncillibrary/PLR_7918-0289-00.pdf

Guildford Town Centre – UrbanSurrey

The long-awaited first phase of Surrey’s LRT is a go-ahead, following today’s announcement of an agreement between the provincial government and the Mayor’s Council to fund the project. Billed as the largest transit and transportation investment in the history of the Metro Vancouver region, the plan will see:

  • Construction of the Surrey Guildford-Newton Light Rail (LRT)
  • Construction of Millennium Line Broadway Extension
  • Significant upgrade of existing Expo-Millennium Lines to expand capacity to meet and improve the customer experience
  • An 8% increase in bus service to address overcrowding, reduce wait times and bring bus services to communities with limited service
  • Improvements to sidewalks, bikeways, multi-use pathways and roadways

According to the media release, delivery of these projects will be funded by:

  • $1.6 billion in fare revenues expected from higher ridership resulting from service expansion in Phase Two, TransLink resources and efficiencies.
  • A 2% increase to all transit fares over two years beginning in 2020.
  • Parking lot sales tax increase of 15 cents per hour for an average $5 per hour parking.
  • $5.50 increase in property taxes per average household each year or about 46 cents a month, beginning in 2019.
  • About $300 to $600/unit increase to the Development Cost Charge on new residential developments depending on type of dwelling.
  • Revenue from a variety of transit-related commercial opportunities.

Construction by 2019 – Phase 1 Completion by 2024

While federal matching of the provincial funding still needs to be finalized, it is expected that the first phase of the Surrey LRT line between Guildford – City Centre – Newton will likely be under construction by late 2019, with completion by 2024. Not only will the project bring a new a rapid transit line to the South Fraser, it will also be a game-changer in how it will integrate with, and transform the neighbourhoods it passes through. In conjunction with the City Centre Plan and the Guildford-104 Avenue Plan, LRT corridors will be gradually transformed with 4-6-storey density along each route, with higher density mixed-use nodes at key intersections and throughout City Centre, Guildford Town Centre, and Newton Town Centre.

Planned route of Phase 1 & 2 of the Surrey LRT network Conceptual rendering of a revitalized Newton Town Centre with LRT integration Conceptual rendering of King George Blvd in Newton with LRT, bike-lanes, and 4-6-storey urban density Conceptual rendering of LRT plaza integration at Newton Town Centre Conceptual rendering of LRT integration along a repurposed 104 Avenue corridor LRT integration on a pedestrianized City Parkway at Central Ave in City Centre

A new tier of rapid transit for Metro Vancouver

LRT will introduce a new layer of rapid transit service to Metro Vancouver that is complimentary to SkyTrain. It will serve as a more localized, finer-grained service, compared to SkyTrain which can be seen as more of a regional commuter train service. Tiered transit systems are common around the world, with various forms of rail combining to form an intricate and dynamic transit network. A good example of this is Berlin, Germany where there are 4 tiers of rail within its robust transit network. These include:

  • Regional Train (Comparable to WestCoast Express)
  • S-Bahn (Suburban service)
  • U-Bahn (Urban service – Comparable to SkyTrain)
  • MetroTram LRT (Fine-grained urban service)

All of these lines converge at hub stations, with each tier serving a specific purpose.

Berlin rapid transit system featuring 4 tiers of rail – LRT lines shown in light grey

Example – Tiers of Rail Transit in Berlin

Regional Train (Comparable to West Coast Express) S-Bahn – Suburban service (No comparison in Metro Vancouver) U-Bahn – Urban service (Comparable to SkyTrain) MetroTram (LRT) – Fine-grained urban service

Surrey LRT will bring the first fine-grained rail service to Metro Vancouver – appropriate for routes that are more localized, and less regional – such as the Guildford-City Centre-Newton line – but connecting to SkyTrain for regional commuter travel at hub stations. It is likely that we could see LRT build elsewhere in the region following Surrey, given its cost-effectiveness and appropriate scale for many other parts of the region.

The City of Surrey held a public open house last week on the in-progress, Guildford Town Centre – 104 Avenue Plan. The plan, which has been under study since last year, is seeking to define a vision and prepare a long-range land-use plan to guide future growth along the 104 Avenue Corridor and Guildford Town Centre areas.

Presented to the public at the open house last week were 2 land-use concept options, along with a proposed street network, bicycle and pedestrian network, and parks and open space concept.

Land-Use Concept Option 1: Focused Growth

Land-Use Concept Option 1 seeks to focus growth and density in key areas of the plan, such as along 104 Avenue and areas surrounding Guildford Town Centre. The plan envisions:

  • A continuous stretch of 6-storey mixed-use/apartments (Dark orange) along 104 Avenue
  • Mid to high-rise mixed-use (pink) at 104 Ave & 144 St.
  • Mid to high-rise along 104 Ave east of 148 St and to the north and east of Guildford Town Centre – with the tallest tower heights (purple) concentrated on the former Sears site.
  • 4-storey apartment areas (light orange) dispersed throughout the plan area
  • Townhouses (yellow) in a few areas
  • Single Family housing preserved in a number of areas, mostly west of 148 St.

Land-Use Concept Option 1: Focused Growth

Land-Use Concept Option 2: Dispersed Growth

Land-Use Concept Option 2, while very similar, seeks to disperse growth and densities over the plan area, with lower intensities of density, but increased density covering more area. This includes:

  • A wider continuous stretch of 6-storey mixed-use/apartments (Dark orange) along 104 Avenue
  • Mid to high-rise mixed-use (Pink) to the north and east of Guildford Town Centre.
  • 4-storey apartment areas (light orange) more widely dispersed throughout the plan area
  • Townhouses (yellow) more widely dispersed across the plan area
  • Slightly less preserved Single Family housing.

Land-Use Concept Option 2: Dispersed Growth

Proposed Street Network

The proposed street network adds a number of new local and collector streets to improve connectivity through a finer-grained network. One of these new collectors is the currently underway 105A Avenue connector project which will provide an alternate east-west route to 104 Avenue linking City Centre to Guildford. A long-range new street network is shown on the site of Guildford Town Shopping Centre – envisioning the future redevelopment of this mall into an urban district far into the future – similar to the vision for the Metropolis at Metrotown Shopping Centre site in Burnaby under the Metrotown Plan.

Proposed Bike and Pedestrian Network

The proposed bike and pedestrian network creates a number of new multi-use paths and road-separated bike lanes improving connectivity throughout the plan area. Pedestrian and cycling crossings at busy intersections would be enhanced under the plan to improve safety and streetscape integration. Existing bike lanes would be upgraded to be physically separated from the road.

Proposed Parks and Open Space

The proposed parks and open space plan illustrates how parks, habitat areas, and the city’s Green Infrastructure Network will be integrated into the plan area. A key feature of the plan is a ‘Green Loop’ pedestrian and cycling network stretching east-west with north-south connections – improving non-automobile connectivity in the area and connecting the many parks. In addition to existing parks shown in light green, many new parks are shown in dark green, including expansions to Hawthorne Park.

Future Light Rail Transit (LRT)

An integral part of the 104 Avenue – Guildford Town Centre Plan area will be the new LRT line linking City Centre to Guildford along 104 Avenue, and further south to Newton. This urban-style, low floor, LRT system will not just be a rapid transit line passing through the area, but a fully streetscape-integrated, centrepiece of the 104 Avenue corridor. Combined with a continuous 6-storey mixed-use density along 104 Avenue, the corridor will be transformed into a transit/pedestrian-oriented and prioritized streetscape, similar to precedents in Europe and elsewhere around the world. The LRT will support the densities along the the 104 Avenue Corridor, and integrate seamlessly into the community – unlike SkyTrain which bisects and has a negative visual and physical impact on the streetscape.

To find out more about the Guildford Town Centre – 104 Avenue Plan, and participate in the public survey – visit:
http://www.surrey.ca/city-services/24723.aspx

City Centre – Page 2 – UrbanSurrey

A 360 VR rendering has been released by Vancouver-based VR/AR company Stambol Studios, which specializes in creating “hyperrealistic immersive experiences”. According to their website, Stambol also has an office in the very Health & Technology District featured in the 360 VR rendering.

In the 360 VR rendering which can be found here, a glimpse is given into the future of the emerging Health & Technology District at the south end of City Centre near 96th Avenue and 137 St. The hyperrealistic rendering shows the existing City Centre 1, and currently under construction City Centre 2 buildings, along with the recently approved City Centre 3 – all by the developer Lark Group.

The rendering also provides a first glimpse at a future phase of the district, presumably City Centre 4 & 5, shown north of City Centre 2 along 137 St. These towers appear to be taller than their predecessors, and also have a shared podium, suggesting they would be built as a single phase. Lark Group was quoted in a Business in Vancouver article back in March, to have plans for up to 8 towers in the district, which spans from Surrey Memorial Hospital north to Fraser Hwy.

Looking north on 137 St from City Centre 3 towards City Centre 1, 2 and future phase. Future Health & Technology District phase to north of City Centre 2 Future Health & Technology District phase to north of City Centre 2 View looking north from 96th Ave & 137th St towards City Centre 3

Health and Technology District 360

Each year, as part of the Surrey’s Capital Construction Program, approximately 300 capital infrastructure projects related to transportation, drainage, sewer, and water improvements are constructed in the city.  Of these projects this year, the following are set to be completed in City Centre:

Arterial Paving Upgrade

King George Blvd (University Dr to 108 Ave)

Bike Lanes Upgrade

102 Ave (University Dr to 140 St)

New Collector Road 

103A Ave (132 St to 133 St) + 103 Ave (University Dr to City Parkway)

New Signalized Intersection

108 Ave & City Parkway

District Energy Network Expansion

Various Locations

Surrey City Energy is an award-winning City-owned district energy utility that supplies high-density residential, commercial and institutional buildings in City Centre with heat and hot water.

The district energy system produces hot water at centralized facilities and then distributes this hot water by way of a dedicated pipe system to heat buildings throughout various City Centre districts. The system uses low GHG-emission energy sources such as:

  • Organic waste (kitchen scraps, etc.) from residential homes throughout Surrey;
  • Geoexchange from the ground;
  • Solar from the sun;
  • Biomass from clean waste wood;
  • Waste heat from buildings, industry and waste water.

For more on District Energy:
http://www.surrey.ca/community/3475.aspx

For more on City-wide Capital Construction projects in 2017:
http://www.surrey.ca/files/CapitalConstructionBook.pdf

Street Lighting Upgrade to LED

All roads in City Centre

As part of Surrey’s LED Roadway Lighting Upgrade program which began in 2016, the City Centre will continue to have its street lighting upgraded to a modern LED system in 2017. This new lighting system replaces the current orange coloured ‘high pressure sodium (HPS)’ street lights currently in use both in Surrey, and much of the world, with new white coloured LED lighting that provides superior lighting quality, energy, and cost savings.  Surrey will be one of the first cities in Canada to convert its street lighting to LED. The program is to be implemented citywide over the next 5 years.

Conceptual Rendering of Surrey City Centre in 2040

A landmark decision was made tonight as Surrey City Council gave final adoption to the new City Centre Plan. The plan, which has been under development for the past 10 years, is a major revision and update to the first City Centre Plan adopted back in 1991. Its aim is to redefine the vision and help better establish and reinforce a desirable development pattern for Surrey’s downtown. The 500-page document is full of visionary guidelines, objectives, and plans for the area, which will guide development over the next 30 years.

Below are some of the highlights:

The goal of the Surrey City Centre Plan is to help develop and support a regional downtown that is the main business, cultural and activity centre for the City of Surrey. It is anticipated that the existing City Centre population of 32,000 will more than double by 2033 to approximately 68,000 people and the number of jobs will increase from 24,000 to 32,000 over the next 10 years.” The population of Surrey as a whole is expected to grow from 550,000 today to over 800,000 within 30 years to become the largest city in BC.

Surrey’s City Centre is undergoing a major transformation from a suburban centre into a walkable high density, transit oriented downtown for South of the Fraser. Surrey City Centre is envisioned to be the Fraser Valley’s metropolitan centre, connected to major regional destinations by rapid transit and an efficient road network designed to support walking, cycling, and transit. It will be a centre for major employment; services; higher density housing; and commercial, cultural, entertainment, and institutional activity. Surrey City Centre is also designated as Metro Vancouver’s second metropolitan centre in the 2040 Regional Growth Strategy.”

Distinct and vibrant neighbourhoods, including a dynamic and innovative business sector, university, hospital, and civic and historic districts, will form the framework of the City Centre. Each of these areas will have its own unique character that together will create a diverse, authentic, and interesting downtown.”


Artistic rendering of Surrey Central Station and a pedestrianized City Parkway with LRT

City Centre Neighbourhoods

  • The City Centre Plan area has been organized into a number of distinct residential neighbourhoods and mixed use districts each with its own emerging identity, function, and scale. These sub areas help to create a focused, vibrant, and more urban downtown by defining and understanding the plan area through a smaller scale and framework.


1960’s Rickshaw Restaurant Sign at 10522 King George Blvd – Photo by Rebecca Bollwitt/Miss604

  • A Mid-Century Historic District:
    • Building on the historic roots of the area, the vision for the Historic District is to support a pedestrian-oriented eclectic shopping experience with a continuous commercial and retail edge with pedestrian amenities. The historic, mid-century modern feel will be preserved and reinforced through small storefronts, building façade treatment and materials, public art, and signage.
    • New developments will incorporate the 1950’s character by using elements that reflect a mid-century modern design aesthetic. These elements include flat roof lines, vertically oriented windows, cantilevered overhangs, and clean and contemporary lines.
    • Preservation of mid-century heritage signs. If re-use of the sign is not possible, new developments should integrate the heritage sign into the redevelopment through an adaptive re-use approach.


Conceptual rendering of Surrey Central area – Existing and Future SFU buildings in red.

    • Central Downtown:
      • A major transit hub will be located at the core of the district, building on the existing Surrey Central Exchange and SkyTrain station with the addition of light rail transit(LRT). The suburban style bus loop will be reconfigured into a new on-street transit exchange, as the bus layover and ice arenas are relocated away from the central core.
      • The presence of significant new university buildings will expand in the Central Downtown, creating a stronger campus identity and student energy at street level. Research buildings with large floor plates will have active retail street frontages and transparent storefronts to engage the pedestrian with the innovative internal uses.
    • Central City Mall Redevelopment:
      • Over the longer term, the Central City Mall property will redevelop to create a site that has improved interface and connection to Holland Park as well as a broader range of mixed of uses. The retail uses in the parking lot areas along King George Boulevard will intensify and include office and residential components.
      • The interface along Holland Park will also be improved with redevelopment of the parkade structures into high density residential buildings and a redesign that creates direct connection through the mall site to Holland Park.

Greenways and Parks Network

  • The downtown will be known for its green urban infrastructure of parks, plazas, greenways, planted boulevards, and rain gardens, as well as for its existing natural features that include fish bearing creeks, riparian areas, and spectacular views to the North Shore and North Cascade Mountains.

  • Rapid transit is a cornerstone of the City Centre, both for existing conditions as well as future planning. The existing elevated rapid train system (SkyTrain) links the City Centre with the region north of the Fraser River. A new Light Rail Train (LRT) network is planned to expand the rapid transit service. This network consists of two lines: the ‘L-line’, and the ‘Fraser Highway Line’, which is 17 kilometres long.
  • The vision for City Centre’s street network is for a finer-grained, connected framework that facilitates mobility and enhances the safety for all citizens, creating a vibrant, pedestrian-oriented downtown.
  • City Parkway will become a car-free zone from 102A Avenue to Central Avenue (103 Ave) and include an LRT station next to Surrey Central SkyTrain Station. The station area is planned as a signature LRT station with the termination of the Fraser Highway line, and intersection of the L-line along City Parkway.

  • There are three large public plazas in City Centre. The largest is the Civic Plaza, designed as contemporary open space which offers programmable open space for gatherings and large special events. The Civic Plaza will provide a central corridor that connects the institutions of the civic precinct.

  •  The redevelopment of the Recreation Centre and the relocation of the North Surrey Arena’s will enable the extension of the Civic Plaza to the south, ultimately linking with the Central City Plaza to create one of Metro Vancouver’s largest urban plaza systems.

  • Whalley’s Corner Plaza at 108 Avenue and King George Boulevard will provide a contemporary link to the Whalley’s history, with opportunities for public art and interpretation.

  • King George Boulevard, between 102 Avenue and 104 Avenue, will emerge as a true “ Boulevard” , with the low intensity commercial and parking lot uses redeveloping into a street-facing downtown shopping area.
  • As part of humanizing King George Boulevard, a significant public art installation will be located in the centre of King George Boulevard median, in the residual road right-of-way area created by the narrowing of the street as the LRT turns onto 102 Avenue. As well, segregated cycle tracks will be introduced along King George Boulevard.

  • A public art walking loop linking key public art installations. Along the walk will be new art installations, building façade improvements, artistic street furniture, and banners. Corner plazas, seating areas and architectural featuring, will be realized along the art walk through the development of private property.
  • An iconic public art installation is envisioned as part of a cultural catalyst project within the City Centre Plaza. An art installation at a world-class scale, located within the core of City Centre, will inspire residents and visitors, energize an important public space and stimulate social interaction and discussion.
  • The proposed LRT system should incorporate public art features that promote unique community identities.

While there is too much information in the document to fully cover here, overall, this visionary new plan can be seen as at the forefront of contemporary urban design and planning. As it guides growth over the next few decades, Surrey City Centre is likely to become a world-leading example of how to transform a former suburban centre into a high-quality, mixed-use, mixed-density, environmentally sustaining, culturally rich, and desirable urban centre.

For much more on the new City Centre Plan, click below for the full report:

Blackwood Partners – UrbanSurrey

The much anticipated ‘Central City II’ office tower will appear before Surrey Council on Monday for 1st & 2nd readings, as part of the first Council meeting since the summer break. Designed by ZGF Architects, the 25-storey (116.5m / 382 ft.) building will be the successor to the iconic Bing Thom designed ‘Central City I’, built in 2003, and bring much needed new office space to Surrey City Centre. Taking design cues from the original tower, while at the same time having its own distinctive architectural expression, the new building will be located just to the south-east of Central City I at the corner of King George Blvd and Old Yale Rd.

In all, the building is proposed to include:

  • 567,114 sq.ft. of AAA Office Space and Fitness Club on levels 2-25
  • 16,168 sq.ft. of ground-oriented retail, restaurant, and cafe space
  • Landscaped roof terraces on levels 3, 5, 10, 21, and 24
  • A new dedication of City Parkway
  • A new private east-west lane along the north side of the building connecting City Parkway to King George Blvd
  • Plazas and Separated Bike Lanes surrounding the building along King George Blvd, Old Yale Rd, and City Parkway

View looking South along SkyTrain Guideway View Looking South-West along King George Blvd View looking North-West at corner of King George Blvd & Old Yale Rd South and East Elevations West and North Elevations

In terms of design, the building consists of a 25-storey tower with distinctive rust-toned metal panels, above a stepped podium, transitioning to different floor plates at levels 3, 5, 10, 21, and 24. The tower maintains a rounded rectangular form above the podium levels, before transitioning to an elliptical shape – similar to ‘Central City I’ at level 21. Above level 25, the vertical fins extend the curtain wall and frame an additional 2 storeys to conceal the rooftop mechanical equipment, and give the building a 27-storey appearance. The fins also provide space for signage, shown in renderings provided by ZGF, with the Central City logo, similar to the original tower. The bulk of the building’s massing is oriented towards King George Blvd and anchored to Old Yale Rd, creating a strong urban street wall and presence. The building tapers down towards the west, with its 4-storey podium extending to City Parkway, and the SkyTrain guideway.

The main entrance to the building will front onto a new public plaza along Old Yale Rd. This plaza will extend around the building on 3 sides, with retail, restaurant, and cafe space spilling out to activate frontages along City Parkway and King George Blvd. The south-west corner of the site at Old Yale Rd and City Parkway has been identified as a location for a future significant public art piece, subject to separate public art plan process.

Ground floor Site Plan Landscaped outdoor terrace on Level 3 Landscaped outdoor terrace on Level 5 Landscaped outdoor terrace on Level 10 Landscaped outdoor terrace on Level 21

Replacing the former Best Buy store at the corner of the existing mall parking lot, Central City II represents just phase 1 of a master redevelopment plan for the remainder of the Central City Shopping Centre site. More details of that plan will come through future development applications for subsequent phases. Earlier this year, the mall’s owner Blackwood Partners announced plans for a 1.5 storey addition to the existing parkade along University Drive which is expected to get underway in the coming months. Upon completion, this will allow for the closure of rooftop parking above parts of the existing mall along Old Yale Rd and eventual redevelopment of the site across from Holland Park.

Blackwood Partners has submitted a development application for the much anticipated Central City 2 office tower – proposed for the corner of King George Blvd and Old Yale Road on the site of a former Best Buy. The 25-storey tower designed by ZGF Architects is to be built to Class AAA and LEED Platinum standards and contain over 500,000 SF of office space, and 20,000 SF of ground level retail.

The proposed design of the tower has undergone considerable revision since first announced back in November 2017. The tower now features copper / reddish toned shading fins on its exterior, and a refined, more cohesive massing and podium. The tower also features expansive green roof decks, premium fitness facilities for office tenants, bike lockers, electric vehicle charging, high-speed elevators, and a ground level urban plaza, anchored by a restaurant, café, and retail.

New plaza at corner of Old Yale Road & City Parkway Conceptual ground level floor plan Office tower views Premium fitness facilities for office tower tenants

Following the completion of the original Central City office tower and SFU campus back in 2003, Central City 2 will form the next phase of a long-term vision to redevelop the remainder of the Central City Shopping Centre site. While just conceptual at this point, the long-term plan would see the remaining parking lots to the north redeveloped with mixed-use development and new streets. The mall itself is envisioned to be reconfigured to include a number of new tower sites, and a large new plaza entrance fronting Holland Park on Old Yale Road – mirroring the existing Central City Plaza to the north and creating a connection through the mall linking the city’s civic core to Holland Park.

Along with the recently submitted development application, Blackwood Partners has also now begun marketing the tower for lease, and will be opening a presentation centre in the Central City Shopping Centre in early 2019. The current leasing brochure can be found here.

Blackwood Partners, have released new details on their upcoming ‘Central City 2’ office tower project at the corner of Old Yale Rd and King George Blvd. A new leasing brochure, available on the Central City website, provides some updated renderings, floorplans, and marketing information aimed at future tenants looking for office and retail space.

Since first being announced back in November 2017, the new renderings depict a re-designed, more refined tower, from that initially conceptualized. The new design features a stronger podium fronting Old Yale Rd and a more cohesive tower floor-plate and massing compared to the previous design. The rectangular floor plate blends into an elliptical floor plate on higher floors – referencing the existing 25-storey Central City office tower at 102 Ave & University Dr built in 2003.

Conceptual rendering of tower podium and restaurant at corner of City Parkway and Old Yale Rd

Tower Details

Designed by Vancouver’s ZGF Architects, the project will be a 25-storey, Class AAA, mixed- use tower, containing 512,305 SF of commercial space and +/-20,000 SF of retail space contained within the podium. The ground level is conceptualized to contain 6 retail units, a restaurant, cafe, and office tower lobby, anchored to a prominent public plaza at the corner of Old Yale Rd and King George Blvd across from Holland Park and King George Station. The building will be built to LEED GoldDesign (with a pathway to Platinum), and also contain:

  • Premium end-of-trip facilities, with ample bicycle storage, executive bicycle lockers, shower, and change facilities
  • Approximately 900 underground parking stalls
  • High-speed state-of-the-art elevators
  • Electric vehicle charging stations and car share parking spaces.
  • Numerous other advanced technology features

Conceptualized ground-level floor plan Artistic rendering of views from higher-level office floors Artistic rendering of roof-top views overlooking Holland Park Artistic rendering of fitness facilities for office employees

Long-term plan

Also released as part of the leasing brochure is a glimpse at the long-range plan for redevelopment of the entire Central City site following Central City 2. This plan will see much of the existing indoor shopping centre retained but renovated, with the introduction of a new prominent plaza at its south-end along Old Yale Rd, linking the shopping centre directly onto Holland Park. The existing parking lot along King George Blvd is envisioned to be broken up into a series of new city blocks, containing mixed-use high-rise development sites. A re-aligned City Parkway will connect directly through the site from the north, past a new entry plaza where Wal-Mart currently exists.

While no target dates have been given for completion of Central City 2 – it is expected that a development application will be submitted for the project in the near future. The long-range plan for Central City is expected to play out over the next decade or longer. For more on Central City 2:

http://www.centralcity.ca/wp-content/uploads/2018/04/Tower-2-at-Central-City-Brochure-April-2018.pdf

TransLink – UrbanSurrey

A date has finally been set for the official closure of the North Surrey Recreation Centre to make way for the site’s long anticipated redevelopment. In a notice posted on the recreation centre website, the facility is planned to close in 2 phases beginning with a decommissioning of the ice rinks in early September, and finally a closure of the remaining portions of the building on December 22. Ice rink programming will move to the new North Surrey Sport & Ice Complex, set to open on September 3 near Scott Road Station. Following that in January, Aquatics programs will move to Guildford Recreation Centre, fitness and multi-purpose activities to North Surrey Sport & Ice Complex, and preschool programs to Chuck Bailey Recreation Centre.

New North Surrey Sport & Ice Complex

While no timeline has been given for the site’s redevelopment following decommissioning, behind-the-scenes planning work has been underway for years, dating back to 2012. Since then, the City has been working with Simon Fraser University, TransLink, and various architects, planners, and consultants, on a master plan for what is known as the ‘Centre Block’ bounded by Central Avenue to the north, 102 Avenue to the south, University Drive to the west, and City Parkway to the east. Well-positioned adjacent to Surrey Central SkyTrain Station, the site forms a key link between Surrey City Hall / Civic Plaza to the north, and the Central City Complex and beyond to the south.

Back in 2013, Via Architecture prepared a ‘vision’ for what redevelopment could look like in the future. The concept envisioned a numerous mixed-use buildings for the site integrated with a transit-oriented plaza linking City Hall to Central City. The buildings would contain office, university, and retail space. The plan also envisioned:

  • A new bus layover facility to be located on 133A St behind the new SFU Engineering building.
  • A removal and re-configuring of the Surrey Central Bus Exchange – replacing the loop with a new street-oriented exchange along a realigned 102A Avenue and Central Avenue. The 2 streets would be integrated with a new Transit Plaza, designed to accommodate high pedestrian and bus passenger volumes.

Centre Block location between Civic Plaza and Central City Early vision for the Centre Block prepared by Via Architecture in 2013

Since the early Via Architecture vision, a more recent planning process has been underway following a Surrey City Development Corp (SCDC) RFP was filled seeking a new firm to undertake detailed master planning work for the Centre Block site. While no plans have been publicly released yet, what is expected is a major overhaul of Surrey Central Station linked with a new transit-oriented plaza connecting Civic Plaza to Central City, and integrated with over 2 million square feet of new office, university, and retail space. With such a large scale, the plan is expected to be completed in phases, with various puzzle pieces and phasing needing to take place before other phases can begin. The first of those pieces is the decommissioning and demolition of the North Surrey Recreation Centre. The second will be the construction of the new bus layover facility on 133 Street, allowing for removal of the current Bus Loop, and re-alignment of 102A Avenue through it.

With the North Surrey Rec Centre decommissioning now in sight, the pieces are finally coming together to make the Centre Block redevelopment a reality. While the project is likely to take at least a decade to build-out, we could see the start of application activity related to it in the coming year.

For more on the North Surrey Recreation Centre closing:

https://www.surrey.ca/bylawsandcouncillibrary/CR_2019-R133.pdf

Public consultation is set to get underway this month for the proposed Surrey Langley SkyTrain (SLS) extension, as well as the future of rapid transit along 104 Avenue & King George Blvd.

In 2014, the regional Mayors Council identified Fraser Highway, King George Boulevard, and 104 Avenue as priority corridors for rapid transit South of the Fraser in the 10-Year Vision. Following a study looking at combinations of SkyTrain, LRT, and Bus Rapid Transit for the corridors, the Mayors Council decided on 27-km of urban-style LRT on dedicated track (separate from traffic) on each of the corridors to be built over 2 phases:

  • Phase 1: Surrey-Newton-Guildford Line on 104 Avenue & King George Boulevard
  • Phase 2: Surrey-Langley Line on Fraser Highway

With funding in place to cover the entire first phase, and construction set to begin this year – a last minute request was made in 2018 by Surrey’s new Council to the regional Mayors’ Council to suspend the Phase 1 Surrey-Newton-Guildford LRT line and re-direct funding to the Phase 2 Surrey-Langley line instead, while switching the technology of the Phase 2 line to SkyTrain. The Mayors’ Council voted to move forward with this request, and directed TransLink to begin planning work for SkyTrain on Fraser Highway while at the same time re-visit rapid transit plans for 104 Avenue and King George Boulevard corridors.

Proposed Surrey Langley SkyTrain route and conceptual stations

The switch of priorities to the Phase 2 Fraser Highway line and changing its technology to SkyTrain has had implications both in budget and timeline. The funding that was allocated for the full Phase 1 Surrey-Newton-Guildford LRT line has been identified as inadequate to fund the entire Fraser Highway SkyTrain extension to Langley. Pending a future round of funding (timeline unclear), the line may have to be phased, with the current funding getting the line potentially only as far as Fleetwood. Start of construction and delivery of new rapid transit South of the Fraser is also now delayed by approximately 2 years as a result of the switch.

Despite the funding and timeline uncertainties, planning work is nonetheless well underway for the new SLS line, which will need to involve a significant re-evaluation of land-use plans along the Fraser Highway corridor to support SkyTrain, completion of a number of supportive studies, and extensive Public Consultation. In a project update report to Surrey Council this week – a preliminary timeline was given for this work by TransLink, with start of service targeted for 2025.

To run concurrently with the SLS planning and consultation work will be a planning process to ‘refresh’ the South Fraser Rapid Transit Strategy for delivering the Mayors’ Council fully envisioned 27km of Rapid Transit along each of the Fraser Hwy, King George Blvd, and 104 Ave corridors. This refresh will look to re-examine and engage the public on what rapid transit along the remaining corridors could look like, now that SkyTrain has been chosen as the technology for Fraser Hwy. The 2013 Rapid Transit Alternatives Study identified Bus Rapid Transit (BRT) for these corridors based on a scenario with SkyTrain on Fraser Hwy. With much LRT planning work having now been completed however, for the 104 Ave and King George Blvd corridors, it’s possible that LRT could still be an option for them rather than BRT, especially given Surrey’s long-term rapid transit vision for an extensive LRT network on major arterials across the City.

The first round of Public Consultation on the SLS line and South Fraser Rapid Transit refresh gets underway on April 11 in Langley, with open houses in Surrey on April 15, 16, and 17. TransLink has also recently launched an online survey where you can voice your feedback on the proposed SLS line. Open House times are set for the following dates and locations between 3-8pm:

  • Thursday, April 11 – Langley City Hall
  • Monday, April 15 – Surrey Sport & Leisure Complex (Fleetwood)
  • Tuesday, April 16 – Surrey City Hall
  • Wednesday, April 17 – Newton Seniors Centre

More info on the land-use planning review process for the Fraser Highway Corridor being undertaken by the City of Surrey can be found here: https://www.surrey.ca/bylawsandcouncillibrary/CR_2019-R059.pdf

After nearly 2 years of construction, the Surrey Central Station north station house expansion officially opened to the public this weekend. Designed by OMB Architects, the new 2-storey station house is now the largest entrance at the station, fronting directly onto the corner of Central Avenue and City Parkway across from Civic Plaza.

The new station house features a contemporary, open, and airy design consisting of glass, concrete, and wood materials, as well as a prominent new First Nations art installation suspended from the ceiling – ‘The Sea Captain’ by Marianne Nicolson. A new retail unit has also been added to the station next to the entrance fronting Central Avenue, but has yet to be occupied by a tenant.

New entrance fronting Central Ave Corner of Central Ave & City Parkway Looking west down Central Avenue New entrance on City Parkway New entrance with bike racks and benches on City Parkway New ticket and fare gate concourse Fare gate concourse and art installation

Escalator to second floor concourse

2nd floor concourse Wayfinding signage on second floor concourse

Connection to south station entrance New platform level stairs, escalator and elevator

This latest upgrade to Surrey Central Station is just the beginning of an even larger expansion and re-configuration to come in the future. The lands immediately west of the station, where the current North Surrey Recreation Centre and Bus Loop sit – known as the ‘Centre Block’ are expected to be redeveloped in the coming decade. With that will come the removal of the suburban-style bus loop and re-positioning of bus bays onto streets surrounding the station. A major overhaul of the station is expected at that time to modernize and better integrate it into its evolving urban context.

The City of Surrey began a series of 3 open houses on Thursday for Phase 1 of the upcoming Surrey LRT project. This latest public engagement is the 3rd round of open houses on Phase 1 the project, providing refined plans based on public input from previous consultations. Presented at the open house were preliminary station designs, road designs, information on construction planning, environmental and socio-economic study results, and more. A full set of the Open House Boards can be found here.

Station Designs

Overall, stations are designed to be highly visible, well-lit, and well integrated into the community – accessible by well-marked pedestrian crossings providing universal accessibility for all riders. Lengthy platform shelters protect riders from weather, and include space for ATM’s, information boards, seating, and more – while maintaining a clear line of sight to the street and approaching trains. Stations will in most cases be located in the centre median of the street, with the exception of King George, Surrey Central and Newton Town Centre – where they will be plaza oriented, or off to the side. Public art will also be integrated into stations along the route.

Roadway Design

LRT will run on its own dedicated track for the entirety of the line, with the exception of City Parkway where it will be integrated into a pedestrian plaza. Placement of the LRT track will vary – typically located in the centre median for most of the route, but off to the side in some sections.

Roadway design for 104 Avenue will consist of LRT in the centre median, and 1 traffic lane in each direction, widening to include an additional turning lane at major intersections. The 104 Avenue design will also provide upgraded and enhanced sidewalks, pedestrian crossings, and connections to stations. Currently 104 Avenue functions as a non-pedestrian friendly, busy arterial for cars. A re-purposed 104 Avenue with LRT will transform the street into a calmed, pedestrianized and transit-oriented corridor, supported by multi-family housing and streetfront shops along the route. The newly widened 100 Avenue and existing 108th Avenue corridors will become the new car-prioritized east-west routes between City Centre and Guildford while 104 Avenue will be the pedestrian/transit prioritized corridor.

Roadway design for King George Blvd will retain 2 traffic lanes in each direction while allowing for LRT in the median for the majority of the route. Sections of King George in City Centre will see LRT routed off to one side. New separated bike lanes, enhanced sidewalks, and pedestrian crossings will also be a key component of the re-designed King George.

Pedestrianized Plazas at Surrey Central & King George Stations

Taking inspiration from leading cities around the world, Surrey Central and King George Stations in City Centre are designed to be integrated into new pedestrianized public plazas. These plazas will help to create vibrant transfer points between LRT and SkyTrain’s expo line, similar to plaza’s found throughout Europe with multi-modal rail connections running through them. 

Socio-Economic Study: Improved Travel Times

A key finding of the socio-economic study released at the open house, was the improvement in travel times that LRT will offer over the existing 96 B-Line bus service, as well as private automobile. Under Section 7.2 of the study it was found that the existing 96 B-Line service between Guilford-Newton currently takes 29 minutes under ideal conditions. During periods of congestion however, this trip can take longer than 50 minutes. Further, this travel time is expected to worsen as population grows. LRT is able to cut this travel time by up to half, taking a consistent 27-minutes every time, on opening day, and a decade later, due to its dedicated track. In addition to this, LRT offers faster service and improved experience due to:

  • More doors for boarding, significantly reducing stop times at stations, and travel times overall.
  • Nearly twice as frequent peak service as the existing 96 B-Line peak bus service.
  • A smoother, more comfortable ride than B-Line bus, with less stop and go.

96 B-Line subject to traffic congestion – travel times between Guildford and Newton up to 50 mins during peak hours.

Integration with the Community

One of the key benefits of LRT is its integration with the community and streetscape compared to SkyTrain. While SkyTrain serves well as a long distance commuter rail service, LRT is better suited to more localized routes in the region – similar to other cities where there are various tiers of rail transit making up the regional transit network.  Not every line in a city needs to be the same type of rail transit – LRT, Subway, and Commuter Rail are often combined to compliment each other and serve different needs. The introduction of LRT to Metro Vancouver represents a maturing of our rail transit network into a multi-modal system, and it is very likely we will see LRT implemented elsewhere in the region following Surrey.

In Surrey, the 104 Avenue and King George Highway corridors that make up the ‘L’ line are much better suited to urban-style LRT than SkyTrain. Not only is this route more localized than regionally serving, but SkyTrain just doesn’t make sense from a cost perspective, and the impacts that such guideways would have on the streetscapes. Looking at a comparison between SkyTrain guideways in Richmond City Centre and Coquitlam City Centre, it is clear to see how much better LRT integrates with the streetscape and community it passes through, rather than bisecting it with an obtrusive, shadowing, and noisy concrete structure. LRT can transform a streetscape into an inviting, pedestrian friendly, vibrant urban environment – whereas SkyTrain does the opposite. 

Impact of SkyTrain guideways on the urban environment/streetscape vs urban-style LRT

For more on Surrey LRT:

https://surreylightrail.ca

Numerous community and business leaders joined Mayor Linda Hepner today to launch an 8-week LRT showcase, offering residents a first glimpse at Surrey’s future LRT. As part of the showcase, a prototype LRT train car has been brought in from Europe and put on display in the Central City parking lot next to King George Blvd. It will remain there for the next couple of weeks before being relocated to Newton Town Centre, Guildford Town Centre, and finally the Surrey Canada Day celebration in Cloverdale.

The goal of the showcase is to give residents a first-hand look at what the urban-style LRT train will look like. Unlike high-floor commuter-type LRT trains like those in Calgary and Edmonton, Surrey’s LRT will be low-floored, similar to those found in many cities throughout Europe, and even Toronto. Despite being more integrated with the urban environment, the trains will nonetheless run on a dedicated right-of-way, apart from traffic, offering significant improvement over a bus – not only in speed, but also through more consistent/reliable schedules, frequency, capacity, boarding doors, and comfort. It is important to point out that the particular train car brought in for display is just a prototype, and the actual trains chosen for the Surrey line, will likely look a bit different.

LRT was chosen as the mode of choice for rapid transit in Surrey following years of study that began as far back as 2010. Numerous options, and combinations were looked at including LRT, SkyTrain, and Bus Rapid Transit. The results found LRT to be the most cost effective system for Surrey – with 27km of LRT track (2 lines) able to be built for the same $2.2 billion price tag as 16km of SkyTrain (1 line). Surrey gets a more extensive rail transit network, better integrated with the community, creating more pedestrian-orientated streetscapes, with LRT. Further, operating costs for LRT were found to be $6 million cheaper annually, with negligible differences in travel times.

The long-awaited first phase of Surrey’s LRT is a go-ahead, following today’s announcement of an agreement between the provincial government and the Mayor’s Council to fund the project. Billed as the largest transit and transportation investment in the history of the Metro Vancouver region, the plan will see:

  • Construction of the Surrey Guildford-Newton Light Rail (LRT)
  • Construction of Millennium Line Broadway Extension
  • Significant upgrade of existing Expo-Millennium Lines to expand capacity to meet and improve the customer experience
  • An 8% increase in bus service to address overcrowding, reduce wait times and bring bus services to communities with limited service
  • Improvements to sidewalks, bikeways, multi-use pathways and roadways

According to the media release, delivery of these projects will be funded by:

  • $1.6 billion in fare revenues expected from higher ridership resulting from service expansion in Phase Two, TransLink resources and efficiencies.
  • A 2% increase to all transit fares over two years beginning in 2020.
  • Parking lot sales tax increase of 15 cents per hour for an average $5 per hour parking.
  • $5.50 increase in property taxes per average household each year or about 46 cents a month, beginning in 2019.
  • About $300 to $600/unit increase to the Development Cost Charge on new residential developments depending on type of dwelling.
  • Revenue from a variety of transit-related commercial opportunities.

Construction by 2019 – Phase 1 Completion by 2024

While federal matching of the provincial funding still needs to be finalized, it is expected that the first phase of the Surrey LRT line between Guildford – City Centre – Newton will likely be under construction by late 2019, with completion by 2024. Not only will the project bring a new a rapid transit line to the South Fraser, it will also be a game-changer in how it will integrate with, and transform the neighbourhoods it passes through. In conjunction with the City Centre Plan and the Guildford-104 Avenue Plan, LRT corridors will be gradually transformed with 4-6-storey density along each route, with higher density mixed-use nodes at key intersections and throughout City Centre, Guildford Town Centre, and Newton Town Centre.

Planned route of Phase 1 & 2 of the Surrey LRT network Conceptual rendering of a revitalized Newton Town Centre with LRT integration Conceptual rendering of King George Blvd in Newton with LRT, bike-lanes, and 4-6-storey urban density Conceptual rendering of LRT plaza integration at Newton Town Centre Conceptual rendering of LRT integration along a repurposed 104 Avenue corridor LRT integration on a pedestrianized City Parkway at Central Ave in City Centre

A new tier of rapid transit for Metro Vancouver

LRT will introduce a new layer of rapid transit service to Metro Vancouver that is complimentary to SkyTrain. It will serve as a more localized, finer-grained service, compared to SkyTrain which can be seen as more of a regional commuter train service. Tiered transit systems are common around the world, with various forms of rail combining to form an intricate and dynamic transit network. A good example of this is Berlin, Germany where there are 4 tiers of rail within its robust transit network. These include:

  • Regional Train (Comparable to WestCoast Express)
  • S-Bahn (Suburban service)
  • U-Bahn (Urban service – Comparable to SkyTrain)
  • MetroTram LRT (Fine-grained urban service)

All of these lines converge at hub stations, with each tier serving a specific purpose.

Berlin rapid transit system featuring 4 tiers of rail – LRT lines shown in light grey

Example – Tiers of Rail Transit in Berlin

Regional Train (Comparable to West Coast Express) S-Bahn – Suburban service (No comparison in Metro Vancouver) U-Bahn – Urban service (Comparable to SkyTrain) MetroTram (LRT) – Fine-grained urban service

Surrey LRT will bring the first fine-grained rail service to Metro Vancouver – appropriate for routes that are more localized, and less regional – such as the Guildford-City Centre-Newton line – but connecting to SkyTrain for regional commuter travel at hub stations. It is likely that we could see LRT build elsewhere in the region following Surrey, given its cost-effectiveness and appropriate scale for many other parts of the region.

King George – UrbanSurrey

The City of Surrey began a series of 3 open houses on Thursday for Phase 1 of the upcoming Surrey LRT project. This latest public engagement is the 3rd round of open houses on Phase 1 the project, providing refined plans based on public input from previous consultations. Presented at the open house were preliminary station designs, road designs, information on construction planning, environmental and socio-economic study results, and more. A full set of the Open House Boards can be found here.

Station Designs

Overall, stations are designed to be highly visible, well-lit, and well integrated into the community – accessible by well-marked pedestrian crossings providing universal accessibility for all riders. Lengthy platform shelters protect riders from weather, and include space for ATM’s, information boards, seating, and more – while maintaining a clear line of sight to the street and approaching trains. Stations will in most cases be located in the centre median of the street, with the exception of King George, Surrey Central and Newton Town Centre – where they will be plaza oriented, or off to the side. Public art will also be integrated into stations along the route.

Roadway Design

LRT will run on its own dedicated track for the entirety of the line, with the exception of City Parkway where it will be integrated into a pedestrian plaza. Placement of the LRT track will vary – typically located in the centre median for most of the route, but off to the side in some sections.

Roadway design for 104 Avenue will consist of LRT in the centre median, and 1 traffic lane in each direction, widening to include an additional turning lane at major intersections. The 104 Avenue design will also provide upgraded and enhanced sidewalks, pedestrian crossings, and connections to stations. Currently 104 Avenue functions as a non-pedestrian friendly, busy arterial for cars. A re-purposed 104 Avenue with LRT will transform the street into a calmed, pedestrianized and transit-oriented corridor, supported by multi-family housing and streetfront shops along the route. The newly widened 100 Avenue and existing 108th Avenue corridors will become the new car-prioritized east-west routes between City Centre and Guildford while 104 Avenue will be the pedestrian/transit prioritized corridor.

Roadway design for King George Blvd will retain 2 traffic lanes in each direction while allowing for LRT in the median for the majority of the route. Sections of King George in City Centre will see LRT routed off to one side. New separated bike lanes, enhanced sidewalks, and pedestrian crossings will also be a key component of the re-designed King George.

Pedestrianized Plazas at Surrey Central & King George Stations

Taking inspiration from leading cities around the world, Surrey Central and King George Stations in City Centre are designed to be integrated into new pedestrianized public plazas. These plazas will help to create vibrant transfer points between LRT and SkyTrain’s expo line, similar to plaza’s found throughout Europe with multi-modal rail connections running through them. 

Socio-Economic Study: Improved Travel Times

A key finding of the socio-economic study released at the open house, was the improvement in travel times that LRT will offer over the existing 96 B-Line bus service, as well as private automobile. Under Section 7.2 of the study it was found that the existing 96 B-Line service between Guilford-Newton currently takes 29 minutes under ideal conditions. During periods of congestion however, this trip can take longer than 50 minutes. Further, this travel time is expected to worsen as population grows. LRT is able to cut this travel time by up to half, taking a consistent 27-minutes every time, on opening day, and a decade later, due to its dedicated track. In addition to this, LRT offers faster service and improved experience due to:

  • More doors for boarding, significantly reducing stop times at stations, and travel times overall.
  • Nearly twice as frequent peak service as the existing 96 B-Line peak bus service.
  • A smoother, more comfortable ride than B-Line bus, with less stop and go.

96 B-Line subject to traffic congestion – travel times between Guildford and Newton up to 50 mins during peak hours.

Integration with the Community

One of the key benefits of LRT is its integration with the community and streetscape compared to SkyTrain. While SkyTrain serves well as a long distance commuter rail service, LRT is better suited to more localized routes in the region – similar to other cities where there are various tiers of rail transit making up the regional transit network.  Not every line in a city needs to be the same type of rail transit – LRT, Subway, and Commuter Rail are often combined to compliment each other and serve different needs. The introduction of LRT to Metro Vancouver represents a maturing of our rail transit network into a multi-modal system, and it is very likely we will see LRT implemented elsewhere in the region following Surrey.

In Surrey, the 104 Avenue and King George Highway corridors that make up the ‘L’ line are much better suited to urban-style LRT than SkyTrain. Not only is this route more localized than regionally serving, but SkyTrain just doesn’t make sense from a cost perspective, and the impacts that such guideways would have on the streetscapes. Looking at a comparison between SkyTrain guideways in Richmond City Centre and Coquitlam City Centre, it is clear to see how much better LRT integrates with the streetscape and community it passes through, rather than bisecting it with an obtrusive, shadowing, and noisy concrete structure. LRT can transform a streetscape into an inviting, pedestrian friendly, vibrant urban environment – whereas SkyTrain does the opposite. 

Impact of SkyTrain guideways on the urban environment/streetscape vs urban-style LRT

For more on Surrey LRT:

https://surreylightrail.ca

Hilton – UrbanSurrey

Another hotel is coming to City Centre. On Monday, council gave third reading / preliminary approval to a proposed 30-storey mixed-use hotel, condo, and commercial building at the corner of King George Blvd and 98th Ave. Branded as a Hampton by Hilton, the hotel will occupy the building’s 6-storey podium, along with ground level commercial space including a wine bar. Above the podium will be amenity space on the 7th floor, and a residential tower rising to 30 floors. In total, the building will consist of:

  • 181 residential dwelling units
  • 112 hotel rooms
  • 8 two-storey ground oriented townhouses
  • 133 square metres (1,432 sq. ft.) of ground-level commercial space

Designed by Architecture 49, the building features a unique form and massing, high-quality architectural design features, with substantial glazing and a high quality material palette, including an abstract pixelated image of a British Columbia landscape on the podium’s curtain wall glass.

When complete in 2020, the hotel will become City Centre’s second hotel offering an alternative to the upscale 5-star Marriott Autograph Collection – Civic Hotel, which is scheduled to open in November 2017. It will serve the growing nearby medical / technology district known as Innovation Boulevard as well as the needs of other business and personal travellers to the area.

The building will be located directly across from PCI Group’s The Hub at King George project ‘Phase B’, which is expected to begin construction on its 3 towers around the same time as construction would begin on the hotel project in 2018.

For more information on the project:
http://www.surrey.ca/bylawsandcouncillibrary/PLR_7916-0183-00.pdf

SkyTrain – UrbanSurrey

With yesterday’s Mayors Council vote in favour of finalizing the business case for the Surrey-Langley SkyTrain project, it is now certain that SkyTrain will be extended along Fraser Highway, but only as far as Fleetwood within the foreseeable future. As expected, the 1.65 billion in funding currently secured for rapid transit in Surrey will only allow for a 7km / 4 station extension of the Expo Line from King George Station to 166 Street, not to be in service until the end of 2025. With no funding secured, and no timeline in place for a phase 2 extension to Langley, it’s unlikely that SkyTrain will reach Langley before the 2030’s.

Given the decision to go ahead with SkyTrain on Fraser Highway, Surrey’s most urban corridors of 104 Ave and King George Blvd serving the 2 largest Town Centres of Guildford and Newton will likely now see no rapid transit for the next decade, due to the limited 3.55 billion funding envelope (with 1.9 billion yet to be secured) for rapid transit South of the Fraser. This funding envelope would have provided Surrey 27km of LRT across the city, including both the Guildford-City Centre-Newton ‘L’ line, and Fraser Hwy line to Langley. With SkyTrain, Surrey will just receive a single 16.5km line down Fraser Highway instead, along a corridor much more suburban in form, and with much less opportunity for land assembly to higher densities to support a SkyTrain line.

While rapid transit to Langley is definitely a good thing, the reality of the line not likely reaching Langley until the 2030’s, while rapid transit elsewhere in Surrey is stalled, is very unfortunate when Surrey could have had a full 19-Stop (27km) LRT system across the City inclusive of Langley within the same timeframe as an 8-Stop (16.5km) SkyTrain line. LRT additionally would have transformed, urbanized, and distinguished Surrey in ways that SkyTrain will not. LRT and trams are common fixtures and symbols of inner urban cores in major cities around the world, of which Metro Vancouver currently lacks. Cities such as Berlin, with robust multi-tiered rail transit networks, are embarking on major expansions of their LRT networks, on top of their existing metro rail networks. LRT would have urbanized and distinguished Surrey as a city on its own, as an inner core of the region. With SkyTrain, Surrey remains similar to Burnaby, a by-pass suburb along the line to Vancouver. This is not to mention, the negative effects of SkyTrain on the streetscape – obtrusive overhead guideways that cast shadows, are noisy, unsightly, and ultimately very suburban in nature, compared to urbanized street-integrated LRT which can transform a city and its streetscapes.

Eventual 8-Stop (16.5km) SkyTrain to Langley by 2030’s Cancelled 19-Stop (27km) LRT network that would have been completed within same time frame as SkyTrain

It’s hard to imagine rationalizing a 4-station SkyTrain extension to suburban Fleetwood over an 11-station LRT line servicing Surrey’s most urban corridors and largest Town Centres, but here we are. Ultimately once the line does reach Langley in the 2030’s it will help to move people through the region, benefit Surrey’s City Centre (although with less new stations), and those living near the line, but at the expense of what could have been a much more extensive rapid transit system, more urbanizing, distinguishing, and transformative for Surrey.

Public consultation is set to get underway this month for the proposed Surrey Langley SkyTrain (SLS) extension, as well as the future of rapid transit along 104 Avenue & King George Blvd.

In 2014, the regional Mayors Council identified Fraser Highway, King George Boulevard, and 104 Avenue as priority corridors for rapid transit South of the Fraser in the 10-Year Vision. Following a study looking at combinations of SkyTrain, LRT, and Bus Rapid Transit for the corridors, the Mayors Council decided on 27-km of urban-style LRT on dedicated track (separate from traffic) on each of the corridors to be built over 2 phases:

  • Phase 1: Surrey-Newton-Guildford Line on 104 Avenue & King George Boulevard
  • Phase 2: Surrey-Langley Line on Fraser Highway

With funding in place to cover the entire first phase, and construction set to begin this year – a last minute request was made in 2018 by Surrey’s new Council to the regional Mayors’ Council to suspend the Phase 1 Surrey-Newton-Guildford LRT line and re-direct funding to the Phase 2 Surrey-Langley line instead, while switching the technology of the Phase 2 line to SkyTrain. The Mayors’ Council voted to move forward with this request, and directed TransLink to begin planning work for SkyTrain on Fraser Highway while at the same time re-visit rapid transit plans for 104 Avenue and King George Boulevard corridors.

Proposed Surrey Langley SkyTrain route and conceptual stations

The switch of priorities to the Phase 2 Fraser Highway line and changing its technology to SkyTrain has had implications both in budget and timeline. The funding that was allocated for the full Phase 1 Surrey-Newton-Guildford LRT line has been identified as inadequate to fund the entire Fraser Highway SkyTrain extension to Langley. Pending a future round of funding (timeline unclear), the line may have to be phased, with the current funding getting the line potentially only as far as Fleetwood. Start of construction and delivery of new rapid transit South of the Fraser is also now delayed by approximately 2 years as a result of the switch.

Despite the funding and timeline uncertainties, planning work is nonetheless well underway for the new SLS line, which will need to involve a significant re-evaluation of land-use plans along the Fraser Highway corridor to support SkyTrain, completion of a number of supportive studies, and extensive Public Consultation. In a project update report to Surrey Council this week – a preliminary timeline was given for this work by TransLink, with start of service targeted for 2025.

To run concurrently with the SLS planning and consultation work will be a planning process to ‘refresh’ the South Fraser Rapid Transit Strategy for delivering the Mayors’ Council fully envisioned 27km of Rapid Transit along each of the Fraser Hwy, King George Blvd, and 104 Ave corridors. This refresh will look to re-examine and engage the public on what rapid transit along the remaining corridors could look like, now that SkyTrain has been chosen as the technology for Fraser Hwy. The 2013 Rapid Transit Alternatives Study identified Bus Rapid Transit (BRT) for these corridors based on a scenario with SkyTrain on Fraser Hwy. With much LRT planning work having now been completed however, for the 104 Ave and King George Blvd corridors, it’s possible that LRT could still be an option for them rather than BRT, especially given Surrey’s long-term rapid transit vision for an extensive LRT network on major arterials across the City.

The first round of Public Consultation on the SLS line and South Fraser Rapid Transit refresh gets underway on April 11 in Langley, with open houses in Surrey on April 15, 16, and 17. TransLink has also recently launched an online survey where you can voice your feedback on the proposed SLS line. Open House times are set for the following dates and locations between 3-8pm:

  • Thursday, April 11 – Langley City Hall
  • Monday, April 15 – Surrey Sport & Leisure Complex (Fleetwood)
  • Tuesday, April 16 – Surrey City Hall
  • Wednesday, April 17 – Newton Seniors Centre

More info on the land-use planning review process for the Fraser Highway Corridor being undertaken by the City of Surrey can be found here: https://www.surrey.ca/bylawsandcouncillibrary/CR_2019-R059.pdf

After nearly 2 years of construction, the Surrey Central Station north station house expansion officially opened to the public this weekend. Designed by OMB Architects, the new 2-storey station house is now the largest entrance at the station, fronting directly onto the corner of Central Avenue and City Parkway across from Civic Plaza.

The new station house features a contemporary, open, and airy design consisting of glass, concrete, and wood materials, as well as a prominent new First Nations art installation suspended from the ceiling – ‘The Sea Captain’ by Marianne Nicolson. A new retail unit has also been added to the station next to the entrance fronting Central Avenue, but has yet to be occupied by a tenant.

New entrance fronting Central Ave Corner of Central Ave & City Parkway Looking west down Central Avenue New entrance on City Parkway New entrance with bike racks and benches on City Parkway New ticket and fare gate concourse Fare gate concourse and art installation

Escalator to second floor concourse

2nd floor concourse Wayfinding signage on second floor concourse

Connection to south station entrance New platform level stairs, escalator and elevator

This latest upgrade to Surrey Central Station is just the beginning of an even larger expansion and re-configuration to come in the future. The lands immediately west of the station, where the current North Surrey Recreation Centre and Bus Loop sit – known as the ‘Centre Block’ are expected to be redeveloped in the coming decade. With that will come the removal of the suburban-style bus loop and re-positioning of bus bays onto streets surrounding the station. A major overhaul of the station is expected at that time to modernize and better integrate it into its evolving urban context.

Since my last post on the differences between the proposed LRT and SkyTrain generated much discussion – I felt it would be good to highlight in more detail – the key land-use, route, and scope differences between the 2 routes, and why SkyTrain down Fraser Highway – makes no rational sense from a land-use or planning perspective.

LRT (Phase 1)

The proposed LRT route along 104 Avenue and King George Blvd serves Surrey’s City Centre, 2 largest Town Centres, and 2 most urban corridors, designated to handle the bulk of Surrey’s urban growth and revitalization over the next few decades. The 104 Avenue and King George Corridors contain numerous major trip-generating destinations which include:

  • Surrey City Centre – would be served by 4 LRT stations
  • Guildford Town Centre – Largest Town Centre in Surrey with existing high-rise residential, hotels, offices.
  • Guildford Shopping Centre – 3rd largest shopping centre in Metro Vancouver
  • Guildford – 104 Avenue Corridor Plan – Currently underway land-use plan which will direct increased density, growth, and revitalization along this key corridor linking City Centre and Guildford – would be served by 4 LRT stations.
  • Surrey Memorial Hospital – As well as the emerging Health & Technology District surrounding it would be served by 96th Avenue Station
  • Bear Creek Park / Surrey Art Gallery – and surrounding area would be served by 88th Avenue Station
  • Newton Industrial Area – Large employment area consisting of light industrial, business parks, commercial – would be served by 2 LRT stations.
  • Newton Town Centre – 2nd largest Town Centre in Surrey – already significant retail, offices and planned increased density/growth.

In addition LRT would create 2 vibrant multi-modal transfer hub stations at Surrey Central and King George – integrated into new urban plazas.

Multi-Modal Transfer Hub Station at Surrey Central integrated into Plaza Envisioned Newton Town Centre Plaza with LRT integration

SkyTrain (Phase 1?)

While it is unclear how far down Fraser Hwy SkyTrain could be extended given current funding, an extension to Langley is unlikely within the 1.65 Billion approved budget. As such, the Fraser Highway SkyTrain line would have to be phased, with Phase 1 likely going as far as Fleetwood, and future extension to Langley at a later undermined date (by 2030?). Such a SkyTrain extension down Fraser Highway makes absolutely no rational sense from a land-use or planning perspective. Fleetwood is Surrey’s smallest Town Centre, with no plans for any significant increases in density or growth. Fraser Highway is also a very low density, predominantly single family / strip mall corridor with few trip-generating destinations along the route. The only nodes of significance are:

  • Fleetwood Town Centre – Smallest of Surrey’s Town Centres. The current Fleetwood Town Centre Plan designates this area for modest urban growth, consisting of townhouses, village like commercial, and some 4-6 storey apartments.
  • RCMP E-Division / Jim Pattison Outpatient – The only major destinations along this route would be at the 140th & Fraser Hwy station (assuming a station is proposed at this location)
  • 152 & Fraser Hwy Commercial Area – Currently a low-density strip mall area with no current land-use plans underway for revitalization. A land-use plan to change the density in this area would be necessary given the introduction of rapid transit to the area. This would present a major change to the Surrey OCP and where future density/growth directed to in Surrey.

In addition, a Fraser Highway SkyTrain extension would lack any vibrant multi-modal transfer hub stations centered on plazas. A missed opportunity for city building / urban revitalization.

Likely 3-stop ‘Phase 1’ SkyTrain extension to Fleetwood with current funding Likely terminus of Phase 1 Fraser Hwy SkyTrain extension in Fleetwood

Timeline?

  • LRT is scheduled to begin construction in 2019 with the 10.5km Phase 1 completed by 2024.
  • SkyTrain would need to start from scratch in 2019, beginning with at least 2 years of design, planning, consultation. New land-use plans would have to be initiated along the route – as land-use must be planned in cohesion with rapid transit. A 5.5 km Phase 1 extension of SkyTrain to Fleetwood could likely be completed by 2026.

By 2030 – assuming a second round of funding is made available – there are 2 possible scenarios for rapid transit in Surrey:

Scenario 1 – Surrey’s 2030 Rapid Transit Network – LRT

Scenario 1 would see 27km of rapid transit built in Surrey, serving both the Guildford – Newton corridors, as well as the Fraser Highway corridor to Langley.

Scenario 2 – Surrey’s 2030 Rapid Transit Network – SkyTrain

Scenario 2 would see 15.5km of rapid transit built serving only the Fraser Highway corridor to Langley. Guildford and Newton – Surrey’s 2 largest and most urban centre’s would have no rapid transit. While Doug McCallum does mention a future SkyTrain extension down King George Highway to Newton – this is unlikely until the Langley extension is complete – so post 2030.

Best way to spend $1.65 Billion?

Each of these scenarios costs the same $1.65 Billion price tag.

  • Which option do you think provides more value to Surrey?
  • Which option will result in the most rapid transit for Surrey by 2030?
  • Which option will best integrate with the neighbourhoods it passes through, create a sense of place, and be a catalyst for vibrant communities? Rather than just a means of by-passing Surrey to get somewhere else.
  • Which communities should be prioritized for rapid transit?

With Doug McCallum’s win in last weekend’s election, Surrey appears to be in for change. Campaigning heavily on LRT and Safety, the topic of discussion now is whether he will deliver on his promise to ‘scrap’ LRT and ‘replace’ it with SkyTrain. It appears the majority of Surrey residents are in favour of this – fuelled by non-stop negative publicity of LRT in the media – but what does an LRT to SkyTrain ‘switch’ actually mean for Surrey? A few key implications to consider:

SkyTrain vs LRT – 2 different routes

A misconception that many who ‘voted’ for SkyTrain over LRT may have may have is that the proposed LRT will simply be ‘switched’ to SkyTrain. This is not the case – each would run along a different route. Let’s look at the difference:

LRT – City Centre-Newton-Guildford: The proposed ‘Phase 1’ LRT route – with secured funding and significant planning and design work already completed – is planned run from Guildford along 104 Avenue to City Centre, then south on King George Blvd to Newton. This is known as the ‘L’ Line or Surrey-Netwon-Guildford Line – serving Surrey’s most populated, and urban town centres.

Phase 1 LRT route along 104 Ave & King George Blvd + future Phase 2 route to Langley

SkyTrain – Fraser Highway: Doug McCallum’s SkyTrain – which would need to be planned and designed from scratch – would provide no rapid transit to Guildford or Newton (Surrey’s most populated / urban town centres) – but instead be an extension of the existing Expo Line down Fraser Highway to Fleetwood, Cloverdale (Surrey’s least populated / urban town centres) and Langley.

SkyTrain extension to Langley along Fraser Hwy through low density suburbs / ALR to Langley

The Land-Use Difference

LRT: The proposed ‘Phase 1’ LRT route would serve Surrey’s most established urban corridors with the highest densities – 104 Avenue and King George Blvd. Guildford Town Centre contains the regions 2nd largest shopping centre, numerous high-rises and offices. Further, the currently underway Guildford-104 Avenue Corridor Plan which is set to become adopted in 2019, has designated land all along 104 Avenue between City Centre and Guildford for increased urban densities appropriate for a rapid transit corridor. A similar plan is set to follow for the King George corridor between City Centre and Newton. Simply put – 104 Avenue and King George Blvd are the most appropriate corridors for initial rapid transit expansion in Surrey due to their already underway land-use planning for higher density, and their existing densities, land-use, and most urban character of Surrey’s corridors.

Phase 1 LRT route along existing urban corridors with planned density Guildford – 104 Avenue Corridor Plan – urban density planned along LRT route

SkyTrain: Doug McCallum’s SkyTrain would run down Fraser Highway which currently has no land-use plans for significant urban density underway, and is currently of the lowest density and suburban of corridors in Surrey. The SkyTrain route would run through:

  • Green Timbers Forest for the first 2km of its route
  • the low density suburban neighbourhood of Fleetwood for the next 5km
  • ALR farm land for the next 2km
  • and finally low density suburban Clayton/Cloverdale and Langley for the remaining 6km of the route

This route would have the lowest densities of any SkyTrain corridor in the region – including significant stretches through forest and ALR farm land – unseen anywhere else on the SkyTrain system. SkyTrain along Fraser Highway would require significant land-use changes along Fraser Highway to justify it – including significant increases in density, high-rise towers, and transit-oriented development – similar to elsewhere along the SkyTrain network. This would require changes to the Official Community Plan (OCP) – ironically Doug McCallum campaigned against OCP amendments.

Simply put – this type of development is incompatible with the scale and character of the Fraser Highway corridor that is predominantly newer single family homes and townhomes. Many living along that corridor would surely object to such drastic land-use changes appropriate for a SkyTrain line.

SkyTrain extension through low density suburbs / ALR with no planned urban density

From a land-use planning perspective – it makes the most sense to serve the highest density corridors and urban centres (104 Avenue – King George Blvd) with rapid transit prior to lower density corridors such as Fraser Highway. Instead, a SkyTrain extension over LRT would do the exact opposite of what makes sense. While it is important to provide a rapid transit link to Langley, and connect the communities of Fleetwood, Clayton/Cloverdale with regional rapid transit – from a land-use and planning perspective these areas are lower priority than Guildford and Newton – and Fraser Highway does not have density appropriate for SkyTrain. In an ideal world, Langley would be serviced by long-distance commuter rail such as all-day WestCoast Express – but realistically – LRT may be the best option for serving Langley down Fraser Highway as a Phase 2 project – given the density, scale, and character of that corridor.

Uncertain Timeline

LRT: Funding for the proposed ‘Phase 1’ LRT route is “in the mail” from the Federal and Provincial Governments. Significant planning, consultation work, and design has been underway for years, and the project is now at the procurement stage with construction set to begin in 2019 and completion by 2024.

LRT scheduled to begin construction in 2019 – years of planning, consultation, design already complete.

SkyTrain: Doug McCallum claims that secured funding for LRT can simply be ‘switched’ to fund a SkyTrain extension to Langley instead of the Guildford Newton line. While this may be possible, as the funding doesn’t specify a type of rail – the fact is – no planning, consultation, or design work has been completed on a SkyTrain extension down Fraser Highway. The amount of time and additional resources that would need to go into a SkyTrain extension prior to its construction would not only delay the project for an unforeseen number of extra years – pushing completion of this line to the late 2020’s.

By that time, Phase 2 of the LRT is likely to be under construction – resulting in Surrey having 2 new rapid transit lines by the late 2020’s instead of just a single SkyTrain extension down low-density Fraser Hwy within the same time frame.

While these reasons aren’t exhaustive in the debate – they are very key ones that have been surprisingly absent talking points. Surrey residents may not have been the best informed on the SkyTrain vs LRT debate thanks to the media – to make an educated decision that weighs more factors than just ‘speed of service’ and ‘glamour of SkyTrain vs LRT’ – but in the end it may not matter. The LRT project is likely too far along at this stage and with too much else to consider to simply be ‘switched’. It is being led by non-partisan land-use and transit planning experts in the Planning & Transportation Departments (not the former Mayor or Councillors as some may believe) – experts who should be leading such projects – rather than transit planning on a whim by politicians and voters.

The City of Surrey began a series of 3 open houses on Thursday for Phase 1 of the upcoming Surrey LRT project. This latest public engagement is the 3rd round of open houses on Phase 1 the project, providing refined plans based on public input from previous consultations. Presented at the open house were preliminary station designs, road designs, information on construction planning, environmental and socio-economic study results, and more. A full set of the Open House Boards can be found here.

Station Designs

Overall, stations are designed to be highly visible, well-lit, and well integrated into the community – accessible by well-marked pedestrian crossings providing universal accessibility for all riders. Lengthy platform shelters protect riders from weather, and include space for ATM’s, information boards, seating, and more – while maintaining a clear line of sight to the street and approaching trains. Stations will in most cases be located in the centre median of the street, with the exception of King George, Surrey Central and Newton Town Centre – where they will be plaza oriented, or off to the side. Public art will also be integrated into stations along the route.

Roadway Design

LRT will run on its own dedicated track for the entirety of the line, with the exception of City Parkway where it will be integrated into a pedestrian plaza. Placement of the LRT track will vary – typically located in the centre median for most of the route, but off to the side in some sections.

Roadway design for 104 Avenue will consist of LRT in the centre median, and 1 traffic lane in each direction, widening to include an additional turning lane at major intersections. The 104 Avenue design will also provide upgraded and enhanced sidewalks, pedestrian crossings, and connections to stations. Currently 104 Avenue functions as a non-pedestrian friendly, busy arterial for cars. A re-purposed 104 Avenue with LRT will transform the street into a calmed, pedestrianized and transit-oriented corridor, supported by multi-family housing and streetfront shops along the route. The newly widened 100 Avenue and existing 108th Avenue corridors will become the new car-prioritized east-west routes between City Centre and Guildford while 104 Avenue will be the pedestrian/transit prioritized corridor.

Roadway design for King George Blvd will retain 2 traffic lanes in each direction while allowing for LRT in the median for the majority of the route. Sections of King George in City Centre will see LRT routed off to one side. New separated bike lanes, enhanced sidewalks, and pedestrian crossings will also be a key component of the re-designed King George.

Pedestrianized Plazas at Surrey Central & King George Stations

Taking inspiration from leading cities around the world, Surrey Central and King George Stations in City Centre are designed to be integrated into new pedestrianized public plazas. These plazas will help to create vibrant transfer points between LRT and SkyTrain’s expo line, similar to plaza’s found throughout Europe with multi-modal rail connections running through them. 

Socio-Economic Study: Improved Travel Times

A key finding of the socio-economic study released at the open house, was the improvement in travel times that LRT will offer over the existing 96 B-Line bus service, as well as private automobile. Under Section 7.2 of the study it was found that the existing 96 B-Line service between Guilford-Newton currently takes 29 minutes under ideal conditions. During periods of congestion however, this trip can take longer than 50 minutes. Further, this travel time is expected to worsen as population grows. LRT is able to cut this travel time by up to half, taking a consistent 27-minutes every time, on opening day, and a decade later, due to its dedicated track. In addition to this, LRT offers faster service and improved experience due to:

  • More doors for boarding, significantly reducing stop times at stations, and travel times overall.
  • Nearly twice as frequent peak service as the existing 96 B-Line peak bus service.
  • A smoother, more comfortable ride than B-Line bus, with less stop and go.

96 B-Line subject to traffic congestion – travel times between Guildford and Newton up to 50 mins during peak hours.

Integration with the Community

One of the key benefits of LRT is its integration with the community and streetscape compared to SkyTrain. While SkyTrain serves well as a long distance commuter rail service, LRT is better suited to more localized routes in the region – similar to other cities where there are various tiers of rail transit making up the regional transit network.  Not every line in a city needs to be the same type of rail transit – LRT, Subway, and Commuter Rail are often combined to compliment each other and serve different needs. The introduction of LRT to Metro Vancouver represents a maturing of our rail transit network into a multi-modal system, and it is very likely we will see LRT implemented elsewhere in the region following Surrey.

In Surrey, the 104 Avenue and King George Highway corridors that make up the ‘L’ line are much better suited to urban-style LRT than SkyTrain. Not only is this route more localized than regionally serving, but SkyTrain just doesn’t make sense from a cost perspective, and the impacts that such guideways would have on the streetscapes. Looking at a comparison between SkyTrain guideways in Richmond City Centre and Coquitlam City Centre, it is clear to see how much better LRT integrates with the streetscape and community it passes through, rather than bisecting it with an obtrusive, shadowing, and noisy concrete structure. LRT can transform a streetscape into an inviting, pedestrian friendly, vibrant urban environment – whereas SkyTrain does the opposite. 

Impact of SkyTrain guideways on the urban environment/streetscape vs urban-style LRT

For more on Surrey LRT:

https://surreylightrail.ca

Anthem – UrbanSurrey

Anthem Properties’ announced on Tuesday the acquisition of new 4.4 acre site at 10232 Whalley Blvd on the corner of 102 Avenue. The site is currently occupied by a Toys R’ Us and Dollarama, and is located directly across the street from the developer’s soon-to-be underway ‘Georgetown’ master-planned community – which received preliminary approval for Phase 1 back in April.

In the news release, Anthem notes that they plan on submitting a development application for rezoning of the site in the near future, to allow for a new ‘master-planned residential community’ in line with the City Centre Plan. The site is currently designated ‘Mixed-use / Mid to High-Rise 3.5 FAR’, similar to ‘Georgetown’ across the street, but is likely to see lower towers heights as a transition away from the core to lower density designated lands to the east.

Subject Site within City Centre Plan – designated ‘Mixed-Use / Mid to High Rise 3.5 FAR’ Anthem’s proposed ‘Georgetown’ master-planned community on existing Canadian Tire / Save-On Food site

It is unclear whether the new acquisition will become an extension of ‘Georgetown’ or be marketed as a stand-alone development. Also unclear is how the project will fit into the anticipated decade-long phasing of Georgetown’s 7 towers across the street – whether the project will come to market concurrently with one of those phases or be marketed after the build-out of Georgetown.

For more on Anthem’s Georgetown:

https://anthemproperties.com/properties/surrey-city-centre/

Weststone – UrbanSurrey

WestStone’s controversial Care Facility and Seniors Living project on the site of a mobile home park at 9525 King George Blvd is returning to Council December 5. The project received preliminary approval (1st & 2nd reading) back in June of 2015, but scheduling of a Public Hearing (3rd reading) was deferred to a later date until a City policy on manufactured home park redevelopment be updated, and resident concerns be addressed. Since then, WestStone has completed its acquisition of all 47 mobile-homes in the park, in accordance with the City’s updated manufactured home redevelopment policy, providing relocation assistance to park residents. City staff are now recommending that Council set a date for Public Hearing and approve proceeding to Public Notification for a Development Variance Permit.

According to WestStone, the closing date for the last of its acquisitions in the park will be in June 2017, at which point, the park will be vacated, and work can begin on site clearing, preparation, and construction, pending approvals. When complete, the project will bring a new 12-storey mixed-use care facility and office building to the site, along with two 6-storey independent seniors living apartment buildings. The site is located just south of 96th Avenue on the west side of King George Blvd across from Surrey Memorial Hospital, and will add to the growing cluster of medical-related care, research, and office uses in the Innovation Boulevard district. The project will also dedicate an extension of 95th Avenue through the site, improving the City Centre road network.

http://www.surrey.ca/bylawsandcouncillibrary/PLR_7915-0114-00(3).pdf

A luffing crane has now been installed at WestStone Group’s 36-storey Evolve Condo project in Surrey City Centre’s emerging West Village neighbourhood. The use of a luffing crane is a rare sight in Metro Vancouver condo construction, as it is typically used in situations where movement of the crane is constrained by other buildings. In this case, the adjacent 36-storey Ultra condo tower to the South of the project would prevent a standard crane from being able to swing a full 360 degrees.

When complete in 2018, Evolve will add not only condos, but also retail and commercial space to the West Village neighbourhood along a newly dedicated 103 Ave, forming the beginning of a new neighbourhood centre. Four additional towers will be added through future phases of WestStone’s master plan for the area, along with retail, commercial space, and new pedestrian and road connections.

More on Evolve:

http://evolvecondos.com/location/

The never-ending dig at Weststone Group’s Evolve Condominiums site continues on. Now 6 months in, having started in January, it looks as though there are at least a couple more months to go until the pit is finally cleared, and a crane can be installed likely by late summer / early fall.

When complete in 2018, Evolve will become the 2nd tower after Ultra in Weststone’s West Village neighbourhood. It will feature a 37 storey condo tower, with townhomes at its base, as well as a 3 storey office and commercial podium. The development will also open a new section of 103 Ave, and a new pathway, helping to improve road and pedestrian connectivity in the neighbourhood.

http://evolvecondos.com/